Proactive policies for the stochastic resource-constrained project scheduling problem

被引:103
作者
Deblaere, Filip [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
机构
[1] Katholieke Univ Leuven, Fac Business & Econ, Res Ctr Operat Management, B-3000 Louvain, Belgium
关键词
Project scheduling; Proactive scheduling; Execution policies; Stochastic RCPSP;
D O I
10.1016/j.ejor.2011.04.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability. We propose a stochastic methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:308 / 316
页数:9
相关论文
共 26 条
[1]  
[Anonymous], 2003, PhD thesis
[2]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[3]   OPTIMAL INVENTORY POLICY [J].
Arrow, Kenneth J. ;
Harris, Theodore ;
Marschak, Jacob .
ECONOMETRICA, 1951, 19 (03) :250-272
[4]   Insertion techniques for static and dynamic resource-constrained project scheduling [J].
Artigues, C ;
Michelon, P ;
Reusser, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :249-267
[5]   New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing [J].
Ashtiani, Behzad ;
Leus, Roel ;
Aryanezhad, Mir-Bahador .
JOURNAL OF SCHEDULING, 2011, 14 (02) :157-171
[6]   Proactive heuristic procedures for robust project scheduling: An experimental analysis [J].
de Vonder, Stijn Van ;
Demeulemeester, Erik ;
Herroelen, Willy .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :723-733
[7]  
DEBELS D, 2006, FUTURE RES AVENUES R
[8]   A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem [J].
Debels, Dieter ;
Vanhoucke, Mario .
OPERATIONS RESEARCH, 2007, 55 (03) :457-469
[9]  
DEBLAERE F, 2010, KBI1006 FEB KULEUVEN
[10]   Reactive scheduling in the multi-mode RCPSP [J].
Deblaere, Filip ;
Demeulemeester, Erik ;
Herroelen, Willy .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) :63-74