This research introduces a problem called resource-constrained project scheduling problem with alternative activity chains, which is inspired from project scheduling practice. An AND-OR project network representation is designed for the problem and then an integer linear program is developed. An extended simulated annealing algorithm is proposed to solve the large-scale problem efficiently, which consists of new activity-selection list solution presentation, schedule generation scheme and neighbor generation mechanism. Computational experiments are carried out to validate the proposed model and to evaluate the performance of the proposed algorithm.
机构:
Turkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, TurkeyTurkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, Turkey
Atli, Omer
Kahraman, Cengiz
论文数: 0引用数: 0
h-index: 0
机构:
Istanbul Tech Univ, Dept Ind Engn, TR-80626 Istanbul, TurkeyTurkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, Turkey
机构:
Turkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, TurkeyTurkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, Turkey
Atli, Omer
Kahraman, Cengiz
论文数: 0引用数: 0
h-index: 0
机构:
Istanbul Tech Univ, Dept Ind Engn, TR-80626 Istanbul, TurkeyTurkish Air Force Acad Yesilyurt, Aeronaut & Space Technol Inst, Istanbul, Turkey