Scheduling resource-constrained project problem with alternative activity chains

被引:40
作者
Tao, Sha [1 ]
Dong, Zhijie Sasha [2 ]
机构
[1] Nanjing Univ, Dept Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
[2] Texas State Univ, Ind Engn Program, Ingram Sch Engn, San Marcos, TX 78666 USA
关键词
Resource-constrained project scheduling; Activity chains; Project scheduling problem; AND-OR network; Extended simulated annealing; ANT COLONY OPTIMIZATION; ALGORITHM;
D O I
10.1016/j.cie.2017.10.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This research introduces a problem called resource-constrained project scheduling problem with alternative activity chains, which is inspired from project scheduling practice. An AND-OR project network representation is designed for the problem and then an integer linear program is developed. An extended simulated annealing algorithm is proposed to solve the large-scale problem efficiently, which consists of new activity-selection list solution presentation, schedule generation scheme and neighbor generation mechanism. Computational experiments are carried out to validate the proposed model and to evaluate the performance of the proposed algorithm.
引用
收藏
页码:288 / 296
页数:9
相关论文
共 50 条