Analysis of Tightening Sequence Effects on Preload Behaviour of Offshore Wind Turbine M72 Bolted Connections

被引:17
作者
Braithwaite, Jarryd [1 ]
Mehmanparast, Ali [1 ]
机构
[1] Cranfield Univ, Offshore Renewable Energy Engn Ctr, Cranfield MK43 0AL, Beds, England
关键词
preload; tightening sequence; bolted connections; ELASTIC INTERACTION; FLANGE JOINT;
D O I
10.3390/en12234406
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Offshore wind turbines in shallow waters are predominantly installed using a monopile foundation, onto which a transition piece and wind turbine are attached. Previously, the monopile to transition piece (MP-TP) connection was made using a grouted connection, however, cases of grout failure causing turbine slippage, among other issues, were reported. One solution is to use bolted ring flange connections, which involve using a large number of M72 bolts to provide a firm fixing between the MP-TP. It is in the interest of offshore wind operators to reduce the number of maintenance visits to these wind turbines by maintaining a preload (Fp) level above the minimum requirement for bolted MP-TP connections. The present study focuses on the effect of the tightening sequence on the Fp behaviour of M72 bolted connections. A detailed finite element (FE) model of a seven-bolt, representative segment of a monopile flange was developed with material properties obtained from the available literature. Three analyses were made to examine the effect on Fp after tightening, including the initial Fp level applied to the bolts, the tightening sequence and the effect of an additional tightening pass.
引用
收藏
页数:12
相关论文
共 23 条
[1]   A Tetraparametric Metamodel for the Analysis and Design of Bolting Sequences for Wind Generator Flanges [J].
Abasolo, Mikel ;
Aguirrebeitia, Josu ;
Aviles, Rafael ;
Fernandez de Bustos, Igor .
JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2011, 133 (04)
[2]   Bolt preload scatter and relaxation behaviour during tightening a 4 in-900# flange joint with spiral wound gasket [J].
Abid, M. ;
Hussain, S. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2008, 222 (E2) :123-134
[3]   The effect of bolt tightening methods and sequence on the performance of gasketed bolted flange joint assembly [J].
Abid, Muhammad ;
Khan, Yasir Mehmood .
STRUCTURAL ENGINEERING AND MECHANICS, 2013, 46 (06) :843-852
[4]  
[Anonymous], 2016, COST RED MON FRAM 20
[5]  
Bibel G., 1996, WELD RES COUNC BULL, V408, P1
[6]  
Bibel G.D., 1994, P ASME PRESS VESS PI, P9
[7]  
Bickford JohnH., 2008, INTRO DESIGN BEHAV B
[8]   Failure rate, repair time and unscheduled O&M cost analysis of offshore wind turbines [J].
Carroll, James ;
McDonald, Alasdair ;
McMillan, David .
WIND ENERGY, 2016, 19 (06) :1107-1119
[9]  
Coria I., 2018, P 37 INT C OC OFFSH, P1
[10]  
Det Norske Veritas, 2004, DNV-OS-J101