The 'context' of transport project cost performance: Insights from contract award to final construction costs

被引:12
|
作者
Love, Peter E. D. [1 ]
Ika, Lavagnon A. [2 ]
机构
[1] Curtin Univ, Sch Civil & Mech Engn, GPO Box U1987, Perth, WA 6845, Australia
[2] Univ Ottawa, Telfer Sch Management, 55 Laurier Ave East, Ottawa, ON K1N 6N5, Canada
基金
澳大利亚研究理事会;
关键词
Australia; Context; Cost performance; Construction; Transport projects; OVERRUNS; SUCCESS;
D O I
10.1016/j.retrec.2021.101062
中图分类号
F [经济];
学科分类号
02 ;
摘要
Despite the plethora of studies examining the cost performance of transport projects, we still do not fully understand why they exceed their agreed price for construction. A lack of an in-depth exploration of context has contributed to this lack of understanding. In this paper, we seek to provide a context as to why the construction costs of transport projects experience increases from their contract award. We adopt sense-making approach, which is qualitative in nature, to examine the performance and financial reviews for eight transport projects constructed by an Australian contractor. The reviews are checkpoints undertaken during the construction of projects to monitor actual costs and forecasted profits for the contractor. The reviews are performed at the 50% and 75% milestones of a project's forecasted schedule by a team independent from the contractor's organization. We look into context states of projects such as their programme, quality, safety, design, and management. We use a context breakdown structure to uncover the 'contexts within contexts' that significantly contribute increases to construction costs. We reveal that the mean forecasted contractor margin was almost 9%, which reinforces the belief that there is a lack of competition in the marketplace. Overall, the hierarchy of contexts within contexts we unravel provides further understanding as to why transport projects experience increases in their construction costs. Considering the nature of the recurring contexts that we identify, we recommend that governments recalibrate their approaches to procuring their transport projects. We suggest that they embrace negotiated contracts, alliance contracting, leadership and resourcing strategy, and work toward establishing a generative culture in the projects they procure.
引用
收藏
页数:13
相关论文
共 21 条
  • [1] Objective Construction Contract Award using Cost, Time and Durability Utility
    Lambropoulos, Sergios
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 123 - 133
  • [2] A cost performance analysis of transport infrastructure construction in Slovenia
    Makovsek, Dejan
    Tominc, Polona
    Logozar, Klavdij
    TRANSPORTATION, 2012, 39 (01) : 197 - 214
  • [3] A cost performance analysis of transport infrastructure construction in Slovenia
    Dejan Makovšek
    Polona Tominc
    Klavdij Logožar
    Transportation, 2012, 39 : 197 - 214
  • [4] Large-Scale Transport Infrastructure Project Performance: Generating a Narrative of Context and Meaning
    Love, Peter E. D.
    Ika, Lavagnon A.
    Matthews, Jane
    Fang, Weili
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 70 (10) : 3637 - 3652
  • [5] The use of time and cost utility for construction contract award under European Union Legislation
    Lambropoulos, Sergios
    BUILDING AND ENVIRONMENT, 2007, 42 (01) : 452 - 463
  • [6] The costs of rework: insights from construction and opportunities for learning
    Love, Peter E. D.
    Smith, Jim
    Ackermann, Fran
    Irani, Zahir
    Teo, Pauline
    PRODUCTION PLANNING & CONTROL, 2018, 29 (13) : 1082 - 1095
  • [7] Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance
    Rachmawati, Farida
    Mudjahidin, Mudjahidin
    Widowati, Elok Dewi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (02) : 213 - 225
  • [8] Data exploration on factors that influences construction cost and time performance on construction project sites
    Amusan, Lekan M.
    Afolabi, Adedeji
    Ojelabi, Raphael
    Omuh, Ignatius
    Okagbue, Hilary, I
    DATA IN BRIEF, 2018, 17 : 1320 - 1325
  • [9] Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation
    Salling, Kim Bang
    Leleur, Steen
    TRANSPORT POLICY, 2015, 38 : 8 - 18
  • [10] Construction Cost-Influencing Factors: Insights from a Survey of Engineers in Saudi Arabia
    Mosly, Ibrahim
    BUILDINGS, 2024, 14 (11)