A detailed workforce planning model including non-linear dependence of capacity on the size of the staff and cash management

被引:25
作者
Corominas, Albert [1 ]
Lusa, Amaia [1 ]
Olivella, Jordi [1 ]
机构
[1] Univ Politecn Cataluna, IOC Res Inst, Dept Management, Barcelona, Spain
关键词
Aggregate planning; Production planning; OR in manpower planning; Mixed integer linear programming; Working time accounts; WORKING TIME ACCOUNTS; ANNUALIZED HOURS; SIMULATION; AGGREGATE;
D O I
10.1016/j.ejor.2011.06.027
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper introduces an original planning model which integrates production, human resources and cash management decisions, taking into account the consequences that decisions in one area may have on other areas and allowing all these areas to be coordinated. The most relevant characteristics of the planning problem are: (1) production capacity is a non-linear function of the size of the staff; (2) firing costs may depend on the worker who is fired; (3) working time is managed under a working time account (WA) scheme, so positive balances must be paid to workers who leave the company; (4) there is a learning period for hired workers; and (5) cash management is included. A mixed integer linear program is designed to solve the problem. Despite the size and complexity of the model, it can be solved in a reasonable time. A numerical example, the main results of a computational experiment and a sensibility analysis illustrate the performance and benefits of the model. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:445 / 458
页数:14
相关论文
共 34 条
[1]  
ASHCROFT H, 1950, J ROY STAT SOC B, V12, P145
[2]   A case study of single shift planning and scheduling under annualized hours: A simple three-step approach [J].
Azmat, CS ;
Widmer, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 153 (01) :148-175
[3]   MOAPPS 1.0: aggregate production planning using the multiple-objective tabu search [J].
Baykasoglu, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (16) :3685-3702
[4]   Contingent manpower planning in a high clock speed industry [J].
Bhatnagar, Rohit ;
Saddikutti, Venkatramanaiah ;
Rajgopalan, Anand .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (09) :2051-2072
[5]   Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty [J].
Bihlmaier, Ralf ;
Koberstein, Achim ;
Obst, Rene .
OR SPECTRUM, 2009, 31 (02) :311-336
[6]   Planning annualised hours with a finite set of weekly working hours and joint holidays [J].
Corominas, A ;
Lusa, A ;
Pastor, R .
ANNALS OF OPERATIONS RESEARCH, 2004, 128 (1-4) :217-233
[7]   Capacity planning with working time accounts in services [J].
Corominas, A. ;
Olivella, J. ;
Pastor, R. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (02) :321-331
[8]   Using MILP to plan annualised working hours [J].
Corominas, A ;
Lusa, A ;
Pastor, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (10) :1101-1108
[9]   Using a MILP model to establish a framework for an annualised hours agreement [J].
Corominas, Albert ;
Lusa, Amaia ;
Pastor, Rafael .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (03) :1495-1506
[10]   HUMAN RESOURCE MANAGEMENT USING WORKING TIME ACCOUNTS WITH EXPIRY OF HOURS [J].
Corominas, Albert ;
Lusa, Amaia ;
Pastor, Rafael .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2009, 5 (03) :569-584