Inexact joint-probabilistic stochastic programming for water resources management under uncertainty

被引:17
|
作者
Li, Y. P. [1 ]
Huang, G. H. [1 ]
机构
[1] N China Elect Power Univ, Res Acad Energy & Environm Studies, Beijing 102206, Peoples R China
基金
加拿大自然科学与工程研究理事会;
关键词
decision; interval; joint probability; optimization; uncertainty; water resources; WASTE MANAGEMENT; QUALITY MANAGEMENT; MODEL; OPTIMIZATION; ALGORITHM; OPERATION; RESERVOIR; SYSTEMS;
D O I
10.1080/03052151003622539
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, an inexact two-stage integer program with joint-probabilistic constraint (ITIP-JPC) is developed for supporting water resources management under uncertainty. This method can tackle uncertainties expressed as joint probabilities and interval values, and can reflect the reliability of satisfying (or the risk of violating) system constraints under uncertain events and/or parameters. Moreover, it can be used for analysing various policy scenarios that are associated with different levels of economic consequences when the pre-regulated targets are violated. The developed ITIP-JPC is applied to a case study of water resources allocation within a multi-stream, multi-reservoir and multi-user context, where joint probabilities exist in both water availabilities and storage capacities. The results indicate that reasonable solutions have been generated for both binary and continuous variables. They can help generate desired policies for water allocation and flood diversion with a maximized economic benefit and a minimized system-disruption risk.
引用
收藏
页码:1023 / 1037
页数:15
相关论文
共 50 条
  • [31] An Extended Two-stage Stochastic Programming Approach for Water Resources Management under Uncertainty
    Nematian, J.
    JOURNAL OF ENVIRONMENTAL INFORMATICS, 2016, 27 (02) : 72 - 84
  • [32] An inexact two-stage fuzzy-stochastic programming model for water resources management
    Lu, H. W.
    Huang, G. H.
    Zeng, G. M.
    Maqsood, I.
    He, L.
    WATER RESOURCES MANAGEMENT, 2008, 22 (08) : 991 - 1016
  • [33] An Inventory-Theory-Based Inexact Multistage Stochastic Programming Model for Water Resources Management
    Suo, M. Q.
    Li, Y. P.
    Huang, G. H.
    Fan, Y. R.
    Li, Z.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [34] An Inexact Two-stage Fuzzy-stochastic Programming Model for Water Resources Management
    H. W. Lu
    G. H. Huang
    G. M. Zeng
    I. Maqsood
    L. He
    Water Resources Management, 2008, 22 : 991 - 1016
  • [35] An Inexact Two-Stage Allocation Model for Water Resources Management Under Uncertainty
    Li, C. Y.
    Zhang, L.
    WATER RESOURCES MANAGEMENT, 2015, 29 (06) : 1823 - 1841
  • [36] An Inexact Two-Stage Allocation Model for Water Resources Management Under Uncertainty
    C. Y. Li
    L. Zhang
    Water Resources Management, 2015, 29 : 1823 - 1841
  • [37] An Interval-Parameter Fuzzy Linear Programming with Stochastic Vertices Model for Water Resources Management under Uncertainty
    Han, Yan
    Huang, Yuefei
    Jia, Shaofeng
    Liu, Jiahong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [38] Interval-parameter Two-stage Stochastic Nonlinear Programming for Water Resources Management under Uncertainty
    Yong P. Li
    Guo H. Huang
    Water Resources Management, 2008, 22 : 681 - 698
  • [39] A dual-interval fixed-mix stochastic programming method for water resources management under uncertainty
    Liu, J.
    Li, Y. P.
    Huang, G. H.
    Zeng, X. T.
    RESOURCES CONSERVATION AND RECYCLING, 2014, 88 : 50 - 66
  • [40] An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty
    Li, YP
    Huang, GH
    Nie, SL
    ADVANCES IN WATER RESOURCES, 2006, 29 (05) : 776 - 789