Inexact joint-probabilistic stochastic programming for water resources management under uncertainty

被引:17
|
作者
Li, Y. P. [1 ]
Huang, G. H. [1 ]
机构
[1] N China Elect Power Univ, Res Acad Energy & Environm Studies, Beijing 102206, Peoples R China
基金
加拿大自然科学与工程研究理事会;
关键词
decision; interval; joint probability; optimization; uncertainty; water resources; WASTE MANAGEMENT; QUALITY MANAGEMENT; MODEL; OPTIMIZATION; ALGORITHM; OPERATION; RESERVOIR; SYSTEMS;
D O I
10.1080/03052151003622539
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, an inexact two-stage integer program with joint-probabilistic constraint (ITIP-JPC) is developed for supporting water resources management under uncertainty. This method can tackle uncertainties expressed as joint probabilities and interval values, and can reflect the reliability of satisfying (or the risk of violating) system constraints under uncertain events and/or parameters. Moreover, it can be used for analysing various policy scenarios that are associated with different levels of economic consequences when the pre-regulated targets are violated. The developed ITIP-JPC is applied to a case study of water resources allocation within a multi-stream, multi-reservoir and multi-user context, where joint probabilities exist in both water availabilities and storage capacities. The results indicate that reasonable solutions have been generated for both binary and continuous variables. They can help generate desired policies for water allocation and flood diversion with a maximized economic benefit and a minimized system-disruption risk.
引用
收藏
页码:1023 / 1037
页数:15
相关论文
共 50 条
  • [1] Water Resources Management and Planning under Uncertainty: an Inexact Multistage Joint-Probabilistic Programming Method
    Y. P. Li
    G. H. Huang
    S. L. Nie
    Water Resources Management, 2009, 23 : 2515 - 2538
  • [2] Water Resources Management and Planning under Uncertainty: an Inexact Multistage Joint-Probabilistic Programming Method
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    WATER RESOURCES MANAGEMENT, 2009, 23 (12) : 2515 - 2538
  • [3] Inexact quadratic joint-probabilistic programming for water quality management under uncertainty in the Xiangxi River, China
    Hu, Ming
    Huang, Guo H.
    Sun, Wei
    Li, Yongping P.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2013, 27 (05) : 1115 - 1132
  • [4] Inexact quadratic joint-probabilistic programming for water quality management under uncertainty in the Xiangxi River, China
    Ming Hu
    Guo H. Huang
    Wei Sun
    Yongping P. Li
    Stochastic Environmental Research and Risk Assessment, 2013, 27 : 1115 - 1132
  • [5] An inexact joint-probabilistic programming method for risk assessment in water resources allocation
    Zhuang, X. W.
    Li, Y. P.
    Huang, G. H.
    Zeng, X. T.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2015, 29 (05) : 1287 - 1301
  • [6] An inexact joint-probabilistic programming method for risk assessment in water resources allocation
    X. W. Zhuang
    Y. P. Li
    G. H. Huang
    X. T. Zeng
    Stochastic Environmental Research and Risk Assessment, 2015, 29 : 1287 - 1301
  • [7] A two-stage inexact joint-probabilistic programming method for air quality management under uncertainty
    Lv, Y.
    Huang, G. H.
    Li, Y. P.
    Yang, Z. F.
    Sun, W.
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (03) : 813 - 826
  • [8] Inexact multistage stochastic integer programming for water resources management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Liu, L.
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2008, 88 (01) : 93 - 107
  • [9] An inexact two-stage stochastic programming model for water resources management under uncertainty
    Huang, GH
    Loucks, DP
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2000, 17 (02) : 95 - 118
  • [10] A joint-probabilistic programming method for water resources optimal allocation under uncertainty: a case study in the Beiyun River, China
    Gao, Xueping
    Liu, Yinzhu
    Sun, Bowen
    JOURNAL OF HYDROINFORMATICS, 2018, 20 (02) : 393 - 409