Prioritising investments in safety measures in the chemical industry by using the Analytic Hierarchy Process

被引:35
作者
Abrahamsen, Eirik Bjorheim [1 ]
Milazzo, Maria Francesca [2 ]
Selvik, Jon T. [1 ]
Asche, Frank [1 ,3 ]
Abrahamsen, Hakon Bjorheim [1 ,4 ]
机构
[1] Univ Stavanger, Dept Safety Econ & Planning, Stavanger, Norway
[2] Univ Messina, Dept Engn, Messina, Italy
[3] Univ Florida, Inst Sustainable Food Syst, Gainesville, FL 32611 USA
[4] Stavanger Univ Hosp, Dept Anaesthesiol & Intens Care, Stavanger, Norway
关键词
Analytic Hierarchy Process; Uncertainty; Strength of knowledge; Chemical industry; MANAGEMENT;
D O I
10.1016/j.ress.2020.106811
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we review and discuss the use of Analytic Hierarchy Process as a basis for prioritising investments in safety measures in the chemical industry. We point out that such a framework is not, in general, adequate. First, uncertainty is not properly taken into consideration because the focus is on expected values. Second, little weight is given to the strength of additional knowledge. In this paper we recommend some adjustments to a traditional Analytic Hierarchy Process in order to better guide safety investments. The chemical industry is the starting point, but the discussions are to a large extent general.
引用
收藏
页数:8
相关论文
共 30 条
[1]  
Abrahamsen EB, 2004, RISK DECISION POLICY, V9, P347, DOI DOI 10.1080/14664530490896645
[2]   Using the ALARP principle for safety management in the energy production sector of chemical industry [J].
Abrahamsen, Eirik Bjorheim ;
Abrahamsen, Hakon Bjorheim ;
Milazzo, Maria Francesca ;
Selvik, Jon Tommeras .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 169 :160-165
[3]   An evaluation of the effects on safety of using safety standards in major hazard industries [J].
Abrahamsen, Eirik Bjorheim ;
Asche, Frank ;
Milazzo, Maria Francesca .
SAFETY SCIENCE, 2013, 59 :173-178
[4]  
Aven T., 2008, Risk analysis: assessing uncertainly beyond expected values and Probabilities
[5]   Assessment of Efficiency and Sustainability in a Chemical Industry using Goal Programming and AHP [J].
Barbosa, Luiz Carlos ;
Autran Monteiro Gomes, Luiz Flavio .
3RD INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, ITQM 2015, 2015, 55 :165-174
[6]   An evaluation system of the setting up of predictive maintenance programmes [J].
Carnero, Ma Carmen .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (08) :945-963
[7]  
Daryakin A. A., 2016, ACAD STRATEGIC MANAG, V15, P32
[8]   A review of the past, present and future of the European loss prevention and safety promotion in the process industries [J].
De Rademaeker, Eddy ;
Suter, Georg ;
Pasman, Hans J. ;
Fabiano, Bruno .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2014, 92 (04) :280-291
[9]   Management of health, safety and environment in process industry [J].
Duijm, Nijs Jan ;
Fievez, Cecile ;
Gerbec, Marko ;
Hauptmanns, Ulrich ;
Konstandinidou, Myrto .
SAFETY SCIENCE, 2008, 46 (06) :908-920
[10]   A perspective on Seveso accident based on cause-consequences analysis by three different methods [J].
Fabiano, B. ;
Vianello, C. ;
Reverberi, A. P. ;
Lunghi, E. ;
Maschio, G. .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2017, 49 :18-35