Control of surface settlement by considering shield tunneling technology

被引:23
作者
Zhu, Caihui [1 ,2 ,3 ]
机构
[1] Xian Univ Technol, State Key Lab Base Ecohydraul Engn Arid Areas, Xian, Shaanxi, Peoples R China
[2] Xian Univ Technol, Inst Geotech Engn, 5 South Jinhua Rd, Xian 710048, Shaanxi, Peoples R China
[3] Xian Univ Technol, Shaanxi Prov Key Lab Loess Mech, Xian, Shaanxi, Peoples R China
关键词
control of surface settlement; shield tunneling technology; gap parameter; modified Peck formula; INDUCED GROUND MOVEMENTS; TWIN TUNNELS; DEFORMATION; SHALLOW; SOILS;
D O I
10.1007/s12205-017-0761-0
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the high-speed development of subway construction of China, the prediction and control of surface settlement induced by shield tunneling construction is a hot research topic. In this study, the modified Peck formula was established based on the modified gap parameters that concerned with three factors of the shield construction technology, which were included in the fill rate of grouting and shield eccentricity ratio and support pressure ratio. The control limits of Shield Tunneling Parameters ( STP) were presented on the basis of the Maximum Surface Settlement ( MSS), the allowable partial incline and curvature of settlement trough. With the background of the Xi'an Subway line No. 2, the MSS and partial incline of transverse settlement trough near the ancient structures is less than 15 mm and 0.5%, for the ordinary sections, the value of which is less than 30 mm and 3.0%, respectively. The STP near the ancient structures are controlled as follow: lambda >= 0.64, beta >= 0.81, kappa = 0.59%, and the control limits of STP are lambda = 0.60, beta = 0.77 and. = 0.71% for the ordinary sections.
引用
收藏
页码:2896 / 2907
页数:12
相关论文
共 22 条
  • [21] Xuan H., 2006, THESIS
  • [22] Zhang Y., 2011, STUDY LAWS SURFACE S, V04, P42