A metric-based framework for sustainable production scheduling

被引:28
作者
Abedini, Amin [1 ]
Li, Wei [1 ]
Badurdeen, Fazleena [1 ]
Jawahir, I. S. [1 ]
机构
[1] Univ Kentucky, Dept Mech Engn, Inst Sustainable Mfg, Lexington, KY 40506 USA
关键词
Sustainability; Production scheduling; Trade-off balancing; COMPLETION-TIME VARIANCE; WAIT FLOW-SHOP; SINGLE-MACHINE; ENERGY-CONSUMPTION; JOB SHOPS; MINIMIZATION; OPTIMIZATION; EARLINESS; MAKESPAN; PRINCIPLES;
D O I
10.1016/j.jmsy.2019.12.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production scheduling involves operational level decision making at the shop floor that covers not only the manufacturing stage of the product life-cycle, but also the use stage of the processes. Triple bottom line (TBL) including economic, environmental, and social pillars has been introduced to holistically evaluate the performance of a production firm. Despite the substantial research in sustainable manufacturing, a holistic model that considers all three pillars of the TBL for sustainable production scheduling is virtually absent. This paper presents a metric-based model to systematically and holistically evaluate the sustainability of the production schedules. To this aim, we first perform an extensive literature review to identify the fundamental performance metrics in production scheduling. Second, we assess those metrics with respect to the TBL. Third, we show the inconsistencies among the fundamental performance metrics, and consequently among the objectives defined in the TBL. Finally, we propose a generic model for production scheduling for sustainability based on balancing the trade-offs among the inconsistent objectives. The efficiency and effectiveness of the proposed model is demonstrated using a comprehensive numerical study. The proposed model not only provides a sustainable schedule, but also results in better control over the fundamental performance metrics of the production scheduling.
引用
收藏
页码:174 / 185
页数:12
相关论文
共 73 条
[1]   Scheduling for sustainable manufacturing: A review [J].
Akbar, Muhammad ;
Irohara, Takashi .
JOURNAL OF CLEANER PRODUCTION, 2018, 205 :866-883
[2]   An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (04) :825-830
[3]  
[Anonymous], 1973, MULTIPLE CRITERIA DE
[4]  
[Anonymous], SUT MAN
[5]  
[Anonymous], 2012, LINEAR ALGEBRA GEOME
[6]   The energy scheduling problem: Industrial case-study and constraint propagation techniques [J].
Artigues, Christian ;
Lopez, Pierre ;
Hait, Alain .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :13-23
[7]  
Badurdeen F., 2015, Handbook of Manufacturing Engineering and Technology, P3343
[9]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[10]   Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops [J].
Bruzzone, A. A. G. ;
Anghinolfi, D. ;
Paolucci, M. ;
Tonelli, F. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) :459-462