On the time-consistent stochastic dominance risk averse measure for tactical supply chain planning under uncertainty

被引:13
作者
Escudero, Laureano F. [1 ]
Francisco Monge, Juan [2 ]
Morales, Dolores Romero [3 ]
机构
[1] Univ Rey Juan Carlos, Estadist & Invest Operativa, Mostoles, Madrid, Spain
[2] Univ Miguel Hernandez, Ctr Invest Operativa, Elche, Alicante, Spain
[3] Copenhagen Business Sch, Frederiksberg, Denmark
关键词
Tactical supply chain planning; Nonlinear separable objective function; Multistage stochastic integer optimization; Risk management; Time-consistency; Stochastic nested decomposition; DECOMPOSITION; MODELS; OPTIMIZATION; PROGRAMS; CONSTRAINTS; DEFINITION; GENERATION; ALGORITHM; DECISIONS;
D O I
10.1016/j.cor.2017.07.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this work a modeling framework and a solution approach have been presented for a multi-period stochastic mixed 0-1 problem arising in tactical supply chain planning (TSCP). A multistage scenario tree based scheme is used to represent the parameters' uncertainty and develop the related Deterministic Equivalent Model. A cost risk reduction is performed by using a new time-consistent risk averse measure. Given the dimensions of this problem in real-life applications, a decomposition approach is proposed. It is based on stochastic dynamic programming (SDP). The computational experience is twofold, a comparison is performed between the plain use of a current state-of-the-art mixed integer optimization solver and the proposed SDP decomposition approach considering the risk neutral version of the model as the subject for the benchmarking. The add-value of the new risk averse strategy is confirmed by the computational results that are obtained using SDP for both versions of the TSCP model, namely, risk neutral and risk averse. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:270 / 286
页数:17
相关论文
共 50 条
[21]   A newsvendor model with autocorrelated demand under a time-consistent dynamic CVaR measure [J].
Shi, Ye ;
Alwan, Layth C. ;
Tang, Christopher ;
Yue, Xiaohang .
IISE TRANSACTIONS, 2019, 51 (06) :653-671
[22]   A Two-Stage Stochastic Linear Programming Model for Tactical Planning in the Soybean Supply Chain [J].
dos Reis, Silvia Araujo ;
Leal, Jose Eugenio ;
Thome, Antonio Marcio Tavares .
LOGISTICS-BASEL, 2023, 7 (03)
[23]   COORDINATION OF A SUPPLY CHAIN WITH A LOSS-AVERSE RETAILER UNDER SUPPLY UNCERTAINTY AND MARKETING EFFORT [J].
Xie, Wenying ;
Chen, Bin ;
Huang, Fuyou ;
He, Juan .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2021, 17 (06) :3393-3415
[24]   Combating lead-time uncertainty in global supply chain's shipment-assignment: Is it wise to be risk-averse? [J].
Sun, Xuting ;
Chung, Sai-Ho ;
Choi, Tsan-Ming ;
Sheu, Jiuh-Biing ;
Ma, Hoi Lam .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2020, 138 (138) :406-434
[25]   Tactical supply chain planning under a carbon tax policy scheme: A case study [J].
Fahimnia, Behnam ;
Sarkis, Joseph ;
Choudhary, Alok ;
Eshragh, Ali .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 164 :206-215
[26]   Planning a maritime supply chain for liquefied natural gas under uncertainty [J].
Eriksen, Ulrik ;
Kristiansen, Johan ;
Fagerholt, Kjetil ;
Pantuso, Giovanni .
MARITIME TRANSPORT RESEARCH, 2022, 3
[27]   Composite time-consistent multi-period risk measure and its application in optimal portfolio selection [J].
Zhiping Chen ;
Jia Liu ;
Gang Li ;
Zhe Yan .
TOP, 2016, 24 :515-540
[28]   Composite time-consistent multi-period risk measure and its application in optimal portfolio selection [J].
Chen, Zhiping ;
Liu, Jia ;
Li, Gang ;
Yan, Zhe .
TOP, 2016, 24 (03) :515-540
[29]   A Multi-objective Multi-site Supply Chain Planning Problem under Risk and Uncertainty [J].
Felfel, Houssem ;
Ayadi, Omar ;
Masmoudi, Faouzi .
Design and Modeling of Mechanical Systems - II, 2015, :151-160
[30]   On uniqueness of time-consistent Markov policies for quasi-hyperbolic consumers under uncertainty [J].
Balbus, Lukasz ;
Reffett, Kevin ;
Wozny, Lukasz .
JOURNAL OF ECONOMIC THEORY, 2018, 176 :293-310