SCHEDULING OF PARALLEL MACHINES WITH JOB DELIVERY COORDINATION

被引:0
作者
Liu, Cheng-Hsiang [1 ]
Leu, Bor-Yuh [2 ]
Hsu, Sheng-Yuan [3 ]
机构
[1] Natl Pingtung Univ Sci & Technol, Dept Ind Management, Neipu 912, Pingtung, Taiwan
[2] Minghsin Univ Sci & Technol, Dept Ind Engn & Management, Hsinchu 30401, Taiwan
[3] Chien Kuo Technol Univ, Dept Ind Engn & Management, Changhua 500, Taiwan
来源
INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL | 2012年 / 8卷 / 1B期
关键词
Parallel; Machines scheduling; Heuristic; Genetic algorithms; Production-distribution coordination;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper examines an integrated scheduling model for production and distribution operations. In this model, a set of jobs involving different amounts of storage space in delivery trucks was processed by either one of two parallel machines and delivered by a single truck to one customer area. The objective was to minimize the time required for all jobs to be completed and delivered to the customer area, and the truck returned to the factory; this variable was denoted as Cm. This problem was shown to be NP-hard in the strong sense. Previous related studies have focused on developing optimization-based solutions; however, such optimization-based approaches require a significant amount of computing time to produce an optimal solution. The time required to compute a production schedule is very important in business practice, and thus, we need to develop an effective heuristic to solve these problems. Two heuristics (H1 and H3) and a GA-based algorithm were developed by this study, and simulation experiments were conducted to evaluate the performance of the proposed approaches. The experimental results showed that if transportation time is short or truck capacity is large, then the proposed heuristic H3 should be the scheduling approach of choice; otherwise, the GA-based algorithm is the optimal scheduling approach.
引用
收藏
页码:553 / 566
页数:14
相关论文
共 16 条
[1]  
[Anonymous], IND SCHEDULING
[2]  
Chang PC, 2008, INT J INNOV COMPUT I, V4, P2033
[3]   Machine scheduling with job delivery coordination [J].
Chang, YC ;
Lee, CY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (02) :470-487
[4]   Logistics scheduling with batching and transportation [J].
Chen, Bo ;
Lee, Chung-Yee .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :871-876
[5]   Integrated scheduling of production and distribution operations [J].
Chen, ZL ;
Vairaktarakis, GL .
MANAGEMENT SCIENCE, 2005, 51 (04) :614-628
[6]   Improved algorithms for two single machine scheduling problems [J].
He, Yong ;
Zhong, Weiya ;
Gu, Huikun .
THEORETICAL COMPUTER SCIENCE, 2006, 363 (03) :257-265
[7]  
Holland J.H., 1992, Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control and Artificial Intelligence
[8]   Batch delivery scheduling with batch delivery cost on a single machine [J].
Ji, Min ;
He, Yong ;
Cheng, T. C. E. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) :745-755
[9]  
Jian-Jun Wang, 2010, ICIC Express Letters, V4, P467
[10]  
Lee CY, 2001, J SCHED, V4, P3, DOI 10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO