Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times

被引:21
作者
Mehravaran, Yasaman [1 ]
Logendran, Rasaratnam [1 ]
机构
[1] Oregon State Univ, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
基金
美国国家科学基金会;
关键词
Flowshop; Bicriteria; Sequence-dependent setup time; Non-permutation scheduling; Mixed-integer linear programming; Tabu search with embedded progressive perturbations; JOB;
D O I
10.1016/j.ijpe.2011.11.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a flowshop scheduling problem with sequence-dependent setup times and a bicriteria objective to minimize the work-in-process inventory for the producer and to maximize the customers' service level. The use of a bicriteria objective is motivated by the fact that successful companies in today's environment not only try to minimize their own cost but also try to fulfill their customers' need. Two main approaches, permutation and non-permutation schedules, are considered in finding the optimal schedule for a flowshop. In permutation schedules the sequence of jobs remains the same on all machines whereas in non-permutation schedule, jobs can have different sequence on different machines. A linear mathematical model for solving the non-permutation flowshop is developed to comply with all of the operational constraints commonly encountered in the industry, including dynamic machine availabilities, dynamic job releases, and the possibility of jobs skipping one or more machines, should their operational requirements deem that it was necessary. As the model is shown to be NP-hard, a metasearch heuristic, employing a newly developed concept known as the Tabu search with embedded progressive perturbation (TSEPP) is developed to solve, in particular, industry-size problems efficiently. The effectiveness and efficiency of the search algorithm are assessed by comparing the search algorithmic solutions with that of the optimal solutions obtained from CPLEX in solvable small problem instances. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:953 / 963
页数:11
相关论文
共 50 条
[41]   Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times [J].
Waiman Cheung ;
Hong Zhou .
Annals of Operations Research, 2001, 107 :65-81
[42]   Efficient algorithms for the bucket wheel reclaimer scheduling problem with sequence-dependent setup times [J].
Benbrik, Oualid ;
Benmansour, Rachid ;
Elidrissi, Abdelhak ;
Todosijevic, Raca .
ANNALS OF OPERATIONS RESEARCH, 2025, 351 (01) :1109-1154
[43]   A performance evaluation of permutation vs. non-permutation schedules in a flowshop [J].
Liao, C. J. ;
Liao, L. M. ;
Tseng, C. T. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (20) :4297-4309
[44]   Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics [J].
Roshanaei, V. ;
Esfehani, M. M. Seyyed ;
Zandieh, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) :259-266
[45]   Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times [J].
Rajesh Vanchipura ;
R. Sridharan .
The International Journal of Advanced Manufacturing Technology, 2013, 67 :1337-1353
[46]   Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times [J].
Vanchipura, Rajesh ;
Sridharan, R. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (5-8) :1337-1353
[47]   Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times [J].
Halat, Kourosh ;
Bashirzadeh, Reza .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (9-12) :1907-1915
[48]   Multi-objective distributed reentrant permutation flow shop scheduling with sequence-dependent setup time [J].
Rifai, Achmad Pratama ;
Mara, Setyo Tri Windras ;
Sudiarso, Andi .
EXPERT SYSTEMS WITH APPLICATIONS, 2021, 183
[49]   EDA based Probabilistic Memetic Algorithm for Distributed Blocking Permutation Flowshop Scheduling with Sequence Dependent Setup Time [J].
Duan, Wenzhe ;
Li, Zhengyang ;
Yang, Yixin ;
Liu, Bo ;
Wang, Keyao .
2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, :992-999
[50]   An objective review and perspectives on the permutation flowshop scheduling with no-wait constraint and setup times [J].
Nagano, Marcelo S. ;
Junqueira, Viviane S. V. ;
Rossi, Fernando L. .
IFAC JOURNAL OF SYSTEMS AND CONTROL, 2024, 29