Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times

被引:21
作者
Mehravaran, Yasaman [1 ]
Logendran, Rasaratnam [1 ]
机构
[1] Oregon State Univ, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
基金
美国国家科学基金会;
关键词
Flowshop; Bicriteria; Sequence-dependent setup time; Non-permutation scheduling; Mixed-integer linear programming; Tabu search with embedded progressive perturbations; JOB;
D O I
10.1016/j.ijpe.2011.11.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a flowshop scheduling problem with sequence-dependent setup times and a bicriteria objective to minimize the work-in-process inventory for the producer and to maximize the customers' service level. The use of a bicriteria objective is motivated by the fact that successful companies in today's environment not only try to minimize their own cost but also try to fulfill their customers' need. Two main approaches, permutation and non-permutation schedules, are considered in finding the optimal schedule for a flowshop. In permutation schedules the sequence of jobs remains the same on all machines whereas in non-permutation schedule, jobs can have different sequence on different machines. A linear mathematical model for solving the non-permutation flowshop is developed to comply with all of the operational constraints commonly encountered in the industry, including dynamic machine availabilities, dynamic job releases, and the possibility of jobs skipping one or more machines, should their operational requirements deem that it was necessary. As the model is shown to be NP-hard, a metasearch heuristic, employing a newly developed concept known as the Tabu search with embedded progressive perturbation (TSEPP) is developed to solve, in particular, industry-size problems efficiently. The effectiveness and efficiency of the search algorithm are assessed by comparing the search algorithmic solutions with that of the optimal solutions obtained from CPLEX in solvable small problem instances. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:953 / 963
页数:11
相关论文
共 50 条
[1]   Comments on "A bicriteria m-machine flowshop scheduling with sequence-dependent setup times" [J].
Xu, Dehua ;
Yin, Yunqiang .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (07) :3639-3643
[2]   Permutation flowshops in group scheduling with sequence-dependent setup times [J].
Naderi, B. ;
Salmasi, Nasser .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) :177-198
[3]   Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times [J].
Pan, Quan-Ke ;
Gao, Liang ;
Li, Xin-Yu ;
Gao, Kai-Zhou .
APPLIED MATHEMATICS AND COMPUTATION, 2017, 303 :89-112
[4]   An effective metaheuristic with a differential flight strategy for the distributed permutation flowshop scheduling problem with sequence-dependent setup times [J].
Guo, Heng-wei ;
Sang, Hong-yan ;
Zhang, Biao ;
Meng, Lei-lei ;
Liu, Li-li .
KNOWLEDGE-BASED SYSTEMS, 2022, 242
[5]   Study on Heuristics for the Permutation Flowshop with Sequence Dependent Setup Times [J].
Dong, Xingye ;
Huang, Houkuan ;
Chen, Ping .
PROCEEDINGS OF THE 2009 IEEE INTERNATIONAL CONFERENCE ON INFORMATION REUSE AND INTEGRATION, 2008, :417-421
[6]   A bicriteria m-machine flowshop scheduling with sequence-dependent setup times [J].
Eren, Tamer .
APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) :284-293
[7]   Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times [J].
S. Afshin Mansouri ;
S. Hamed Hendizadeh ;
Nasser Salmasi .
The International Journal of Advanced Manufacturing Technology, 2009, 40 :1216-1226
[8]   Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times [J].
Mansouri, S. Afshin ;
Hendizadeh, S. Hamed ;
Salmasi, Nasser .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12) :1216-1226
[9]   Non-permutation flowshop scheduling with dual resources [J].
Mehravaran, Yasaman ;
Logendran, Rasaratnam .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (13) :5061-5076
[10]   Hybrid electromagnetism-like algorithm for the flowshop scheduling with sequence-dependent setup times [J].
Mirabi, M. ;
Fatemi Ghomi, S.M.T. ;
Jolai, F. ;
Zandieh, M. .
Journal of Applied Sciences, 2008, 8 (20) :3621-3629