Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times

被引:21
|
作者
Mehravaran, Yasaman [1 ]
Logendran, Rasaratnam [1 ]
机构
[1] Oregon State Univ, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
基金
美国国家科学基金会;
关键词
Flowshop; Bicriteria; Sequence-dependent setup time; Non-permutation scheduling; Mixed-integer linear programming; Tabu search with embedded progressive perturbations; JOB;
D O I
10.1016/j.ijpe.2011.11.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a flowshop scheduling problem with sequence-dependent setup times and a bicriteria objective to minimize the work-in-process inventory for the producer and to maximize the customers' service level. The use of a bicriteria objective is motivated by the fact that successful companies in today's environment not only try to minimize their own cost but also try to fulfill their customers' need. Two main approaches, permutation and non-permutation schedules, are considered in finding the optimal schedule for a flowshop. In permutation schedules the sequence of jobs remains the same on all machines whereas in non-permutation schedule, jobs can have different sequence on different machines. A linear mathematical model for solving the non-permutation flowshop is developed to comply with all of the operational constraints commonly encountered in the industry, including dynamic machine availabilities, dynamic job releases, and the possibility of jobs skipping one or more machines, should their operational requirements deem that it was necessary. As the model is shown to be NP-hard, a metasearch heuristic, employing a newly developed concept known as the Tabu search with embedded progressive perturbation (TSEPP) is developed to solve, in particular, industry-size problems efficiently. The effectiveness and efficiency of the search algorithm are assessed by comparing the search algorithmic solutions with that of the optimal solutions obtained from CPLEX in solvable small problem instances. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:953 / 963
页数:11
相关论文
共 50 条
  • [1] Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
    Ramezanian, Reza
    Vali-Siar, Mohammad Mahdi
    Jalalian, Mahdi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3311 - 3333
  • [2] An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times
    Karabulut, Korhan
    Oztop, Hande
    Kizilay, Damla
    Tasgetiren, M. Fatih
    Kandiller, Levent
    COMPUTERS & OPERATIONS RESEARCH, 2022, 142
  • [3] A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times
    Huang, Jiangping
    Pan, Quanke
    Chen, Qingda
    2019 3RD INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE APPLICATIONS AND TECHNOLOGIES (AIAAT 2019), 2019, 646
  • [4] Flowshop scheduling with sequence dependent setup times and batch delivery in supply chain
    Rahman, Humyun Fuad
    Janardhanan, Mukund Nilakantan
    Chuen, Liam Poon
    Ponnambalam, S. G.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [5] Permutation flowshops in group scheduling with sequence-dependent setup times
    Naderi, B.
    Salmasi, Nasser
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) : 177 - 198
  • [6] A Multiobjective Variable Neighborhood Search with Learning and Swarm for Permutation Flowshop Scheduling with Sequence-Dependent Setup Times
    Li, Kun
    Tian, Huixin
    PROCESSES, 2022, 10 (09)
  • [7] A Discrete Artificial Bee Colony Algorithm for the Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times
    Ince, Yavuz
    Karabulut, Korhan
    Tasgetiren, M. Fatih
    Pan, Quan-ke
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 3401 - 3408
  • [8] Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times
    Pan, Quan-Ke
    Gao, Liang
    Li, Xin-Yu
    Gao, Kai-Zhou
    APPLIED MATHEMATICS AND COMPUTATION, 2017, 303 : 89 - 112
  • [9] Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
    Lin, Shih-Wei
    Ying, Kuo-Ching
    Lee, Zne-Jung
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) : 1110 - 1121
  • [10] An iterated local search for the multi-objective permutation flowshop scheduling problem with sequence-dependent setup times
    Xu, Jianyou
    Wu, Chin-Chia
    Yin, Yunqiang
    Lin, Win-Chin
    APPLIED SOFT COMPUTING, 2017, 52 : 39 - 47