Co-Planning of Investments in Transmission and Merchant Energy Storage

被引:99
作者
Dvorkin, Yury [1 ]
Fernandez-Blanco, Ricardo [2 ]
Wang, Yishen [3 ]
Xu, Bolun [3 ]
Kirschen, Daniel S. [3 ]
Pandzic, Hrvoje [4 ]
Watson, Jean-Paul [5 ]
Silva-Monroy, Cesar A. [6 ]
机构
[1] NYU, Dept Elect & Comp Engn, Tandon Sch Engn, Brooklyn, NY 11201 USA
[2] European Commiss, Joint Res Ctr, NL-1755 LE Petten, Netherlands
[3] Univ Washington, Dept Elect Engn, Seattle, WA 98195 USA
[4] Univ Zagreb, Fac Elect Engn & Comp, Zagreb 10000, Croatia
[5] Sandia Natl Labs, Discrete Math & Optimizat Dept, POB 5800, Albuquerque, NM 87185 USA
[6] Sandia Natl Labs, Elect Power Res Grp, POB 5800, Albuquerque, NM 87185 USA
关键词
Electricity market; energy storage siting; energy storage sizing; profitability of energy storage; tri-level optimization; transmission expansion planning; MARKET; SYSTEMS; LEVEL;
D O I
10.1109/TPWRS.2017.2705187
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Suitably located energy storage systems are able to collect significant revenue through spatiotemporal arbitrage in congested transmission networks. However, transmission capacity expansion can significantly reduce or eliminate this source of revenue. Investment decisions bymerchant storage operators must, therefore, account for the consequences of potential investments in transmission capacity by central planners. This paper presents a tri-levelmodel to co-optimizemerchant electrochemical storage siting and sizing with centralized transmission expansion planning. The upper level takes the merchant storage owner's perspective and aims to maximize the lifetime profits of the storage, while ensuring a given rate of return on investments. The middle level optimizes centralized decisions about transmission expansion. The lower level simulates market clearing. The proposed model is recast as a bi-level equivalent, which is solved using the column-andconstraint generation technique. A case study based on a 240-bus, 448-line testbed of the Western Electricity Coordinating Council interconnection demonstrates the usefulness of the proposed tri-level model.
引用
收藏
页码:245 / 256
页数:12
相关论文
共 52 条
[1]  
[Anonymous], CAP COSTS TRANSM SUB
[2]  
[Anonymous], 2015, TECH REP
[3]  
[Anonymous], THESIS
[4]  
[Anonymous], IEEE T SUST IN PRESS
[5]  
[Anonymous], P 2015 12 INT C EUR, DOI DOI 10.1109/EEM.2015.7216754
[6]  
[Anonymous], THESIS
[7]  
[Anonymous], HYAK SUPERCOMPUTER
[8]  
[Anonymous], TECH REP
[9]  
[Anonymous], 2013, Tech. Rep
[10]  
[Anonymous], IEEE T POWE IN PRESS