共 16 条
[1]
Bomberger E. E., 1966, MANAGE SCI, V12, P778, DOI DOI 10.1287/MNSC.12.11.778
[2]
COOKE DL, 2001, THESIS U CALGARY CAL
[3]
DAVIS SG, 1995, INT J PROD RES, V33, P1007, DOI 10.1080/00207549508930191
[6]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[8]
ELMAGHRABY SE, 1977, P 4 INT C PROD RES T
[9]
APPLICATION OF MARGINAL ANALYSIS TO THE ECONOMIC LOT SCHEDULING PROBLEM
[J].
AIIE TRANSACTIONS,
1978, 10 (04)
:354-361
[10]
An optimal algorithm for the basic period approach to the economic lot scheduling problem
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1997, 25 (03)
:355-364