Some comments on "Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency"
被引:6
作者:
Koo, Jeongin
论文数: 0引用数: 0
h-index: 0
机构:
KITECH Korea Inst Ind Technol, Res Inst Sustainable Mfg, 89 Yangdaegiro Gil, Cheonan 31056, Chungnam, South KoreaKITECH Korea Inst Ind Technol, Res Inst Sustainable Mfg, 89 Yangdaegiro Gil, Cheonan 31056, Chungnam, South Korea
Koo, Jeongin
[1
]
论文数: 引用数:
h-index:
机构:
Kim, Byung-In
[2
]
机构:
[1] KITECH Korea Inst Ind Technol, Res Inst Sustainable Mfg, 89 Yangdaegiro Gil, Cheonan 31056, Chungnam, South Korea
[2] POSTECH Pohang Univ Sci & Technol, Dept Ind & Management Engn, 77 Cheongam Ro, Pohang 37673, Gyeongbuk, South Korea
Linear programming;
Production scheduling with electricity cost;
Unrelated parallel machine scheduling;
D O I:
10.1007/s00170-016-8375-0
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
This note reveals the deficiencies in the mathematical model proposed by Moon et al. (Int J Adv Manuf Technol 68:523-535, 2013) and presents three corrected models and their corresponding computational performance.