Application of Bored Pile Anchor Cable Technology in Foundation Pit Construction

被引:1
作者
Feng, Zhengwei [1 ]
Guo, Peicheng [1 ]
机构
[1] Xiamen Univ, Dept Engn Management, Tan Kah Kee Coll, Zhangzhou 363105, Fujian, Peoples R China
来源
2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING | 2019年 / 330卷
关键词
D O I
10.1088/1755-1315/330/2/022044
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With rapid development of the city, demands for civil air defense, underground commercial and underground parking in human society have increased. Development of the construction space towards the underground is enhanced, and foundation pit excavation is widely used. Bore pile + anchor cable supporting model has been used more and more in deep foundation pit supporting. Based on engineering examples, this essay expounds the construction scheme of deep foundation pit support for a residential area project, introduces the construction technology of bore pile, crown beam and waist beam, and analyzes in detail the construction technology of the installation, grouting and tension anchoring of anchor cable in prestressed anchor cable construction. The quality control points in the construction are discussed and summarized in depth, which could provide powerful reference for the implementation of civil engineering construction tasks and ensure smooth progress of the project to achieve the expected results.
引用
收藏
页数:5
相关论文
共 50 条
[21]   TEST OF BORED PILE WITHOUT BALLAST AND ANCHOR [J].
JAROMINIAK, A .
PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1989, :1153-1154
[22]   The Finite Element Analysis of Pile-anchor Support System in Foundation Pit [J].
Liu Huixin ;
Qi Ping ;
Zhou Qunli .
ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 1, PROCEEDINGS: COMPUTING SCIENCE AND ITS APPLICATION, 2009, :131-+
[23]   Bored pile foundation at great Depths [J].
不详 .
BAUINGENIEUR, 2014, 89 :A12-A12
[24]   Simulation of bored pile construction [J].
Zayed, TM ;
Halpin, DW .
WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2001, :1495-1503
[25]   RETRACTION: Application of Internet of Things Technology in the Construction of Bored Pile Foundation in a High Altitude Environment (Retraction of Vol 2022, art no 4848447, 2022) [J].
Liu, J. ;
Wang, Y. ;
Guo, Y. ;
Chen, Z. ;
Jiao, D. .
JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2023, 2023
[26]   DEFORMATION RULE OF BORED PILE & STEEL SUPPORT FOR DEEP FOUNDATION PIT IN SANDY PEBBLE GEOLOGY [J].
Cheng, Xuansheng ;
He, Jiuru ;
Li, Xinlei ;
Xia, Qingchun ;
Su, Hongling ;
Chen, Chaobo .
CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03) :282-297
[27]   Numerical calculation for pile-cable reinforcement in strain softening foundation pit [J].
Liu, Zi-You .
Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (07) :2833-2837
[28]   Application of flexible reinforcement with anchor in foundation pit based on rheological [J].
School of Resources and Safety Engineering, Central South University, Changsha 410083, China ;
不详 .
Jiefangjun Ligong Daxue Xuebao, 2009, 5 (467-471)
[29]   Research on deformation control and prevention measures of pile anchor support system in foundation pit [J].
Li Yudian ;
Shi Yanjun ;
Li Haibo ;
Luo Yaxin ;
Gao Qiuyue ;
Wang Chao ;
Zhang Songwang .
2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
[30]   The application of anchor block in large soft foundation pit excavation [J].
Ma, Chi ;
Liu, Guonan ;
Liang, Yueying .
PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 :520-524