A closed coal yard grid construction simulation

被引:1
作者
Wang, Yabing [1 ]
机构
[1] Taiyuan Univ Technol Architecture & Civil Engn, Taiyuan 030024, Peoples R China
来源
Progress in Industrial and Civil Engineering III, Pt 1 | 2014年 / 638-640卷
关键词
slice installation and aerial bulk; construction simulation; deflection and stress values;
D O I
10.4028/www.scientific.net/AMM.638-640.1672
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A closed coal yard grid's tructure is the shell and tube bolt ball grid, larger span, rise high higher, the highest point to ground is very high. This space truss's construction method uses slice installation and aerial bulk construction method. Use Midas Gen 8.0 software to calculate and analyze the whole structure of the grid construction, simulate the construction process, calculate the rod deflection and stress values, the calculated results meet the regulatory requirements. This paper provide some reference for future similar projects.
引用
收藏
页码:1672 / 1675
页数:4
相关论文
共 5 条
  • [1] [Anonymous], 2003, GB50017
  • [2] [Anonymous], 2002, GB502052001
  • [3] [Anonymous], 2010, 72010 JGJ
  • [4] Chen X., 2008, China Water Transp, P40, DOI [10.3969/j.issn.1006-7973-C.2008.12.019, DOI 10.3969/J.ISSN.1006-7973-C.2008.12.019]
  • [5] Wei, 2011, LOW TEMPERATURE ARCH, P68