Long-term Transmission Rights in the Nordic Electricity Markets: TSO Perspectives

被引:0
作者
Spodniak, Petr [1 ]
Makkonen, Mari [2 ]
Honkapuro, Samuli [2 ]
机构
[1] Lappeenranta Univ Technol, LUT Sch Business & Management, Lappeenranta, Finland
[2] Lappeenranta Univ Technol, LUT Sch Energy Syst, Lappeenranta, Finland
来源
2016 13TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM) | 2016年
关键词
portfolios; risk analysis; transmission lines;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The EU Member States have adopted the Forward Capacity Allocation (FCA) network code which defines, among others, that Financial Transmission Rights (FTR) are the main mechanism for securing cross-border transmission capacity in Europe. However, in the Nordic electricity markets different contracts called Electricity Price Area Differential (EPAD) are in use. In this paper, we tentatively estimate the financial impacts of FTR auctions on the Finnish and Swedish transmission system operators (TSOs). We use modern portfolio theory to study the expected amounts of congestion income needing to be redistributed from the emittance of yearly, quarterly and monthly FTRs in 2012 and 2013. We assume the TSOs sell FTR volume equal to 70% of net transfer capacity (NTC) of a given interconnector. We find out that the expected portfolio returns do not necessarily exceed the collected congestion rents (TSOs' income), but the returns' expected volatility is high.
引用
收藏
页数:5
相关论文
共 13 条
[1]  
ACER, 2011, FRAM GUIDL TRANSM CA
[2]  
Amundsen E.S., 2006, Electricity Market Reform, P145, DOI [10.1016/B978-008045030-8/50007-2, DOI 10.1016/B978-008045030-8/50007-2]
[3]   The rationality of asset allocation recommendations [J].
Elton, EJ ;
Gruber, MJ .
JOURNAL OF FINANCIAL AND QUANTITATIVE ANALYSIS, 2000, 35 (01) :27-41
[4]  
ENTSO-E, 2013, NETW COD FORW CAP AL
[5]  
Fingrid, 2015, MARK INT INT PRIC AR
[6]  
Fingrid, 2015, PITK OIK LONG TERM T
[7]  
Hagman B., 2011, FTRS NORDIC ELECT MA
[8]   PORTFOLIO SELECTION [J].
Markowitz, Harry .
JOURNAL OF FINANCE, 1952, 7 (01) :77-91
[9]  
Nord Pool Spot, 2015, TRANSM SYST OP TSO C
[10]  
Pool Nord, 2015, MAP PRIC AR