A paradigm shift in risk management in public-private partnership arrangements

被引:3
作者
Lima, Sonia [1 ]
Brochado, Ana [1 ]
Marques, Rui [1 ]
机构
[1] ISCTE IUL, Lisbon, Portugal
关键词
Key risk indicator; Public-private partnership; Risk management; WATER-SUPPLY PROJECTS; STRATEGIC RISKS; PPP; INFRASTRUCTURE;
D O I
10.2166/wp.2021.106
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
This research sought to determine how public-private partnership (PPP) arrangements can more efficiently address risk management issues using the example of Mozambique as a case study. Analyses of 15 interviews in this country were conducted using the Gioia methodology. The results indicate that integrating key risk indicators into PPP contracts can improve risk management. These measures have been widely used in company risk management. The indicators can serve as monitoring, reviewing and supervising tools, allowing the integration of external factors into PPP contracts at the right time, which is hard to predict when the contracts are signed. Key risk indicators can capture megatrends, track risk evolution and develop future scenarios throughout the entire lifecycle of contracts, preventing conflicts between partners, contract renegotiations or early contract terminations by facilitating an improved understanding of contracts' current realities. The findings suggest that these measures should be applied by PPP units. The proposed approach encourages originality and empirical research-based improvements of PPP risk management frameworks and provides guidelines for future studies.
引用
收藏
页码:1344 / 1358
页数:15
相关论文
共 58 条
[1]  
ADB, 2009, AS DEV BANK GUID NOT
[2]   "We do what we can do to save a woman" health workers' perceptions of health facility readiness for management of postpartum haemorrhage [J].
Al-beity, Fadhlun Alwy ;
Pembe, Andrea B. ;
Kwezi, Hilda A. ;
Massawe, Siriel N. ;
Hanson, Claudia ;
Baker, Ulrika .
GLOBAL HEALTH ACTION, 2020, 13 (01)
[3]   Risk allocation in public-private partnership water supply projects in Ghana [J].
Ameyaw, Effah Ernest ;
Chan, Albert P. C. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (03) :187-208
[4]   Evaluating key risk factors for PPP water projects in Ghana: a Delphi study [J].
Ameyaw, Ernest ;
Chan, Albert .
JOURNAL OF FACILITIES MANAGEMENT, 2015, 13 (02) :133-+
[5]   Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (02) :152-+
[6]  
[Anonymous], 2018, Risk management: Guidelines
[7]  
[Anonymous], 2010, Dedicated Public-Private Partnership Units, DOI DOI 10.1787/9789264064843-EN
[8]   Management controls for minimising risk in public-private partnerships in a developing country Evidence from Sri Lanka [J].
Appuhami, Ranjith ;
Perera, Sujatha .
JOURNAL OF ACCOUNTING AND ORGANIZATIONAL CHANGE, 2016, 12 (03) :408-431
[9]   Barriers to public private partnership projects in developing countries A case of Nigeria [J].
Babatunde, Solomon Olusola ;
Perera, Srinath ;
Zhou, Lei ;
Udeaja, Chika .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (06) :669-691
[10]  
Beasley M.S., 2010, Developing key risk indicators to strengthen enterprise risk management