Flexible assembly line design problem with fixed number of workstations

被引:17
|
作者
Barutcuoglu, Sirin [1 ]
Azizoglu, Meral [1 ]
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
关键词
flexible assembly lines; assembly line balancing; branch and bound algorithm;
D O I
10.1080/00207543.2010.492410
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the paper, we study a flexible assembly line design problem with equipment decisions. We assume the task times and equipment costs are correlated in the sense that for all tasks the cheaper equipment gives no smaller task time. Given the cycle time and number of workstations we aim to find the assignment of tasks and equipment to the workstations so as to minimise the total equipment cost. We develop a branch and bound algorithm that uses powerful lower bounds and reduction mechanisms. Our computational experiments have revealed that our algorithm can solve large-sized problem instances in reasonable solution times.
引用
收藏
页码:3691 / 3714
页数:24
相关论文
共 50 条
  • [31] A dynamic programming based heuristic for the assembly line balancing problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 787 - 794
  • [32] A SIMULATED ANNEALING APPROACH FOR PARALLEL ASSEMBLY LINE BALANCING PROBLEM
    Cercioglu, Hakan
    Ozcan, Ugur
    Gokcen, Hadi
    Toklu, Bilal
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2009, 24 (02): : 331 - 341
  • [33] The application of a tabu search metaheuristic to the assembly line balancing problem
    Chiang, WC
    ANNALS OF OPERATIONS RESEARCH, 1998, 77 (0) : 209 - 227
  • [34] Ant algorithm with summation rules for assembly line balancing problem
    Zhang Ze-qiang
    Cheng Wen-ming
    Tang Lian-sheng
    Zhong Bin
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (14TH) VOLS 1-3, 2007, : 369 - 374
  • [35] A Tabu Search Algorithm for the Parallel Assembly Line Balancing Problem
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2009, 22 (04): : 313 - 323
  • [36] Model and heuristics for the Assembly Line Worker Integration and Balancing Problem\
    Moreira, Mayron Cesar O.
    Miralles, Cristobal
    Costa, Alysson M.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 54 : 64 - 73
  • [37] A fuzzy assembly line balancing problem with physical workload constraints
    Mutlu, Ozcan
    Ozgormus, Elif
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5281 - 5291
  • [38] Optimally solving the alternative subgraphs assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    ANNALS OF OPERATIONS RESEARCH, 2009, 172 (01) : 243 - 258
  • [39] An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing
    Liu, Qingtao
    Wei, Xinji
    Wang, Qi
    Song, Jiayao
    Lv, Jingxiang
    Liu, Ying
    Tang, Ou
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 198
  • [40] Bi-criteria assembly line balancing by considering flexible operation times
    Hamta, Nima
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Bahalke, Unes
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (12) : 5592 - 5608