Project complexity and team-level absorptive capacity as drivers of project management performance

被引:137
作者
Bjorvatn, Torbjorn [1 ]
Wald, Andreas [1 ]
机构
[1] Univ Agder, Sch Business & Law, POB 422, N-4604 Kristiansand, Norway
关键词
Project management success; Project management performance; Project complexity; Absorptive capacity; COMMON METHOD BIAS; TEMPORARY ORGANIZATIONS; FUNCTIONAL DIVERSITY; METHOD VARIANCE; MEDIATING ROLE; KNOWLEDGE; SUCCESS; UNCERTAINTY; INNOVATION; EXECUTION;
D O I
10.1016/j.ijproman.2018.05.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Many believe that project complexity reduces project management performance. However, so far research has failed to establish this causal relationship conclusively. We extend research on project complexity by introducing the concept of team-level absorptive capacity and by studying its role as mediator between project complexity and project management success. Applying structural equation modelling to a sample of 285 respondents, we find an unequivocal, direct and positive statistical association between project complexity and delays and overspending. Further, we show that team-level absorptive capacity is critical for successful project management, but also that absorptive capacity can only partially offset the harmful impact of project complexity. Beyond adding to project management theory, the paper contributes to the wider management literature. We establish complexity as an antecedent of absorptive capacity and demonstrate how each dimension of absorptive capacity has unique determinants and outcomes. (C) 2018 Elsevier Ltd, APM and IPMA. All rights reserved.
引用
收藏
页码:876 / 888
页数:13
相关论文
共 83 条
[1]  
[Anonymous], 2000, The Psychology of Survey Response, DOI DOI 10.1017/CBO9780511819322
[2]   Bibliometric analysis of absorptive capacity [J].
Apriliyanti, Indri Dwi ;
Alon, Ilan .
INTERNATIONAL BUSINESS REVIEW, 2017, 26 (05) :896-907
[3]  
Atkinson R., 1999, INT J PROJ MANAG, V17, P337, DOI [DOI 10.1016/S0263-7863(98)00069-6, 10.1016/S0263-7863(98)00069-6]
[4]   Soaking It Up: Absorptive Capacity in Interorganizational New Product Development Teams [J].
Backmann, Julia ;
Hoegl, Martin ;
Cordery, John L. .
JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 2015, 32 (06) :861-877
[5]   ASSESSING CONSTRUCT-VALIDITY IN ORGANIZATIONAL RESEARCH [J].
BAGOZZI, RP ;
LI, YJ ;
PHILLIPS, LW .
ADMINISTRATIVE SCIENCE QUARTERLY, 1991, 36 (03) :421-458
[6]   Clarifying the project complexity construct: Past, present and future [J].
Bakhshi, Javad ;
Ireland, Vernon ;
Gorod, Alex .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) :1199-1213
[7]   Temporary Organizing: Promises, Processes, Problems [J].
Bakker, Rene M. ;
DeFillippi, Robert J. ;
Schwab, Andreas ;
Sydow, Joerg .
ORGANIZATION STUDIES, 2016, 37 (12) :1703-1719
[8]   The Architecture of complexity [J].
Barabasi, Albert-Lashlo .
IEEE CONTROL SYSTEMS MAGAZINE, 2007, 27 (04) :33-42
[9]   Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework [J].
Bosch-Rekveldt, Marian ;
Jongkind, Yuri ;
Mooi, Herman ;
Bakker, Hans ;
Verbraeck, Alexander .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) :728-739
[10]   Comparing alternative conceptualizations of functional diversity in management teams: Process and performance effects [J].
Bunderson, JS ;
Sutcliffe, KM .
ACADEMY OF MANAGEMENT JOURNAL, 2002, 45 (05) :875-893