MODELLING PRODUCTION UNCERTAINTIES USING THE ADAPTIVE NEURO-FUZZY INFERENCE SYSTEM

被引:3
作者
Azizi, A. [1 ]
bin Ali, A. Y. [2 ]
Ping, L. W. [2 ]
机构
[1] Univ Malaysia, Fac Mfg Engn, Pahang, Malaysia
[2] Univ Sci, Fac Mech Engn, George Town, Malaysia
关键词
SUPPLY CHAIN; MACHINE BREAKDOWN; DEMAND; OPTIMIZATION; REGRESSION; FORECAST; IMPACTS; PLANTS;
D O I
10.7166/26-1-560
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production throughput measures the performance and behaviour of a production system. Production throughput modelling is complex because of uncertainties in the production line. This study examined the potential application of the adaptive neuro-fuzzy inference system (ANFIS) to modelling the throughput of production under five significant production uncertainties: scrap, setup time, break time, demand, and lead time of manufacturing. The effects of these uncertainties on the production of floor tiles were studied by performing 104 observations on the production uncertainties over 104 weeks, based on a weekly production plan in a tile manufacturing industry. The results of the ANFIS model were compared with the multiple linear regression (MLR) model. The results showed that the ANFIS model was capable of forecasting production throughput under uncertainty with higher accuracy than was the MLR model, indicated by an R-squared of 98 per cent.
引用
收藏
页码:224 / 234
页数:11
相关论文
共 51 条
[1]   Improved supply chain management based on hybrid demand forecasts [J].
Aburto, Luis ;
Weber, Richard .
APPLIED SOFT COMPUTING, 2007, 7 (01) :136-144
[2]   Studying the impact of uncertainty in operational release planning - An integrated method and its initial evaluation [J].
Al-Emran, Ahmed ;
Kapur, Puneet ;
Pfahl, Dietmar ;
Ruhe, Guenther .
INFORMATION AND SOFTWARE TECHNOLOGY, 2010, 52 (04) :446-461
[3]  
[Anonymous], 1997, IEEE T AUTOM CONTROL, DOI DOI 10.1109/TAC.1997.633847
[4]  
[Anonymous], 1994, Journal of intelligent and Fuzzy systems
[5]   A Neuro-Fuzzy-Regression Algorithm for Improved Prediction of Manufacturing Lead Time with Machine Breakdowns [J].
Asadzadeh, S. M. ;
Azadeh, A. ;
Ziaeifar, A. .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2011, 19 (04) :269-281
[6]  
Atwater J. B., 1994, Production and Inventory Management Journal, V35, P53
[7]  
Beale H, 2001, FUZZY SYSTEMS TOOLBO
[8]  
Bishop CM., 1995, NEURAL NETWORKS PATT
[9]   Availability modeling for the application of manufacturing equipment [J].
Brall, A ;
Gardner, L .
ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2002 PROCEEDINGS, 2002, :411-416
[10]   A STRUCTURED ANALYSIS OF MATERIAL REQUIREMENTS PLANNING SYSTEMS UNDER COMBINED DEMAND AND SUPPLY UNCERTAINTY [J].
BRENNAN, L ;
GUPTA, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (07) :1689-1707