A correlation between P-wave velocity, number of joints and Schmidt hammer rebound number

被引:79
作者
Kahraman, S [1 ]
机构
[1] Univ Nigde, Fac Engn & Architecture, TR-5100 Nigde, Turkey
关键词
D O I
10.1016/S1365-1609(01)00034-X
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
[No abstract available]
引用
收藏
页码:729 / 733
页数:5
相关论文
共 17 条
[1]  
[Anonymous], 6702 US BUR MIN
[2]  
[Anonymous], 1974, ROCK MECH JAPAN, DOI DOI 10.1016/J.ENGGEO.2007.12.004
[3]  
[Anonymous], 1981, P INT S WEAK ROCK
[4]  
[Anonymous], 1981, ISRM SUGGESTED METHO
[5]  
Deere DU, 1966, ENG CLASSIFICATION I
[6]   FORMATION VELOCITY AND DENSITY - DIAGNOSTIC BASICS FOR STRATIGRAPHIC TRAPS [J].
GARDNER, GHF ;
GARDNER, LW ;
GREGORY, AR .
GEOPHYSICS, 1974, 39 (06) :770-780
[8]   ULTRASONIC STRESS MONITORING IN UNDERGROUND MINING [J].
GLADWIN, MT .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1982, 19 (05) :221-228
[9]  
Hucka V., 1965, Int J Rock Mech Mining Sci Geomech Abstracts, V2, P127, DOI [10.1016/0148-9062(65)90009-4, DOI 10.1016/0148-9062(65)90009-4]
[10]   P-WAVE VELOCITY-MEASUREMENTS IN A MACHINE-BORED, CHALK TUNNEL [J].
HUDSON, JA ;
JONES, EJW ;
NEW, BM .
QUARTERLY JOURNAL OF ENGINEERING GEOLOGY, 1980, 13 (01) :33-43