Renegotiation in Public-Private Partnerships: An Incentive Mechanism Approach

被引:5
作者
Russo, Julio Cezar [1 ,2 ]
Guimaraes Dias, Marco Antonio [3 ]
da Silva Rocha, Andre Barreira [2 ]
Cyrino Oliveira, Fernando Luiz [2 ]
机构
[1] Fed Rural Univ Rio de Janeiro DPCE UFRRJ, Seropedica, Brazil
[2] Pontifical Catholic Univ Rio de Janeiro, Dept Ind Engn, Rua Marques de Sao Vicente 225, BR-22451900 Rio De Janeiro, RJ, Brazil
[3] Pontifical Catholic Univ Rio de Janeiro, Dept Elect Engn, Support Decis Methods Grp, Rua Marques de Sao Vicente 225, BR-22451900 Rio De Janeiro, RJ, Brazil
关键词
Mechanism Design Theory; Renegotiation of PPPs; Contracting; Opportunistic behavior; Revelation principle; INFRASTRUCTURE PROJECTS; CONTRACTS; COMPATIBILITY; DESIGN; MODEL;
D O I
10.1007/s10726-018-9586-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Game theory is an important analytical tool for measuring problems caused by behaviors that deviate from contractual ethics. However, the PPP literature still does little to explore this research topic. This paper analyzes and improves the equilibrium conditions of a renegotiation model of PPPs by introducing the asymmetry of information in the contract. To achieve this goal, the Mechanism Design Theory is used to demonstrate how the correct tracking of the investor directly influences the payoffs of the renegotiation. The study concludes that the lack of incentive constraints in the bidding document, as an ex ante condition, does not provide sufficient information on investor management capability. In this way, this information is only revealed in the renegotiation phase. Consequently, this contract failure results in high political costs to the government due to excessive subsidies.
引用
收藏
页码:949 / 979
页数:31
相关论文
共 50 条
[21]   Renegotiation Strategy of Public-Private Partnership Projects with Asymmetric Information-An Evolutionary Game Approach [J].
Xing, Huige ;
Li, Yuelin ;
Li, Hongyang .
SUSTAINABILITY, 2020, 12 (07)
[22]   A System Dynamics Approach to Concession Period Optimization in Public-Private Partnerships (PPPs) [J].
Castelblanco, Gabriel ;
De Marco, Alberto ;
Casady, Carter B. .
PUBLIC WORKS MANAGEMENT & POLICY, 2025, 30 (03) :292-325
[23]   Public-private partnerships: procedural over results-driven accountability [J].
Parrado, Salvador ;
Reynaers, Anne-Marie .
INTERNATIONAL REVIEW OF ADMINISTRATIVE SCIENCES, 2021, 87 (04) :962-979
[24]   Do exit options increase the value for money of public-private partnerships? [J].
Buso, Marco ;
Dosi, Cesare ;
Moretto, Michele .
JOURNAL OF ECONOMICS & MANAGEMENT STRATEGY, 2021, 30 (04) :721-742
[25]   Public-Private Partnerships in Urban Regeneration Projects: A Review [J].
de Paula, Paula Vale ;
Marques, Rui Cunha ;
Goncalves, Jorge Manuel .
JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2023, 149 (01)
[26]   Paving the way for public-private partnerships in infrastructure development [J].
Zhang, XQ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (01) :71-80
[27]   Innovation in Australian publicly operated public-private partnerships [J].
Saeed, Ali Mohammed ;
Duffield, Colin ;
Hui, Felix .
INFRASTRUCTURE ASSET MANAGEMENT, 2019, 6 (03) :166-177
[28]   Procedural fairness and cooperation in public-private partnerships in China [J].
Zhang, Zhe ;
Jia, Ming .
JOURNAL OF MANAGERIAL PSYCHOLOGY, 2010, 25 (05) :513-538
[29]   EXPLORING SYSTEM BOUNDARIES FOR GREEN PUBLIC-PRIVATE PARTNERSHIPS [J].
Liu, Jinchan ;
Chen, Chuan ;
Zhan, Wenting ;
Li, Xianhao .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2025, 31 (04) :376-394
[30]   Anatomy of public-private partnerships: their creation, financing and renegotiations [J].
Sarmento, Joaquim Miranda ;
Renneboog, Luc .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2016, 9 (01) :94-122