Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model

被引:9
作者
Zhang, Yaqiong [1 ,2 ]
He, Nan [3 ]
Li, Yijing [1 ]
Chen, Yiyang [4 ]
Wang, Lei [2 ]
Ran, Yunlong [5 ]
机构
[1] North China Univ Water Resources & Elect Power, Sch Management & Econ, Zhengzhou 450045, Peoples R China
[2] Zhengzhou Railway Vocat & Syst Coll, Zhengzhou 451460, Peoples R China
[3] North China Univ Water Resources & Elect Power, Sch Publ Management, Zhengzhou 450045, Peoples R China
[4] Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[5] Henan Water Valley Innovat Technol Res Inst Co Lt, Zhengzhou 450046, Peoples R China
关键词
PUBLIC-PRIVATE PARTNERSHIP; PYTHAGOREAN MEMBERSHIP GRADES; ENERGY INCINERATION PROJECTS; CRITICAL SUCCESS FACTORS; SUSTAINABILITY INDICATORS; INFRASTRUCTURE PROJECTS; DEVELOPING-COUNTRIES; MANAGEMENT; CHINA; IDENTIFICATION;
D O I
10.1155/2021/7027990
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Risk assessment of public-private partnership projects has been recently acknowledged as a crucial issue in infrastructure projects. Objective assessment of risk status is conducive to the establishment of scientific and reasonable management measures. The particularity of evaluating water environment treatment PPP projects means that random errors in the evaluation index and the threshold fuzziness of evaluation degrees are issues that require attention. This paper uses the Pythagorean fuzzy cloud model to process the randomness and fuzziness of the indicators. This study assessed the risks of an iconic water environment treatment PPP project inn mid-China. The risk ranks were evaluated in terms of five dimensions: political, economic, construction completion, operational, and ecological. Moreover, the results of the evaluation were compared with results derived using a regular cloud model. It was found that the Pythagorean fuzzy cloud model produced results consistent with the regular method, while also having the advantage of reflecting the randomness and fuzziness of the evaluation indicators. According to the evaluation data in this case, the project risks were ranked as follows: political > construction completion > operational > ecological > economic. The overall project risk was medium. This study's results could provide technical support for water treatment PPP project risk assessment, indicator measurement, and statistical error control.
引用
收藏
页数:15
相关论文
共 69 条
[1]  
AI-Sobiei O.S, 2002, ASSESSMENT RISK ALLO
[2]   Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach [J].
Ameyaw, Effah Ernest ;
Chan, Albert P. C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) :5102-5116
[3]   Evaluating key risk factors for PPP water projects in Ghana: a Delphi study [J].
Ameyaw, Ernest ;
Chan, Albert .
JOURNAL OF FACILITIES MANAGEMENT, 2015, 13 (02) :133-+
[4]   A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
[5]   Compensation mechanism for urban water environment treatment PPP project in China [J].
An, Xiaowei ;
Li, Huimin ;
Wang, Lunyan ;
Wang, Zhuofu ;
Ding, Jiyong ;
Cao, Yongchao .
JOURNAL OF CLEANER PRODUCTION, 2018, 201 :246-253
[6]   The importance and allocation of risks in Indonesian construction projects [J].
Andi .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (01) :69-80
[7]   Managing Critical Risks Affecting the Financial Viability of Public-Private Partnership Projects: Case Study of Toll Road Projects in Vietnam [J].
Anh Nguyen ;
Mollik, Abu ;
Chih, Ying-Yi .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)
[8]  
[Anonymous], 2008, J GEOMATICS SCI TECH
[9]  
Aziz A.A, 2016, MANAGEMENT FORCE MAJ, DOI [10.1061/9780784479827.055, DOI 10.1061/9780784479827.055]
[10]  
Chan A.P.C., 2001, Construction Management and Economics, V19, P699, DOI DOI 10.1080/01446190110066128