AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY

被引:10
作者
Lin, Chien-Liang [1 ]
Lai, Yu-Che [1 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Construct Engn, Kaohsiung, Taiwan
关键词
labor productivity; time-cost trade-off; optimization; genetic algorithm; CONSTRUCTION; OPTIMIZATION; DESIGN; ACCELERATION;
D O I
10.3846/jcem.2020.11663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimization of the time-cost trade off (TCT) has received considerable attention for several decades. However, few studies have considered improving performance/productivity of existing crews. To shorten the gap to real-world applications, this study presents an improved TCT model that considers variable productivity using genetic algorithms (GAs). Through an illustrative case and a real world case, the results demonstrate that improving labor productivity of selected activities by allocating existing crews and management can yield an optimized solution. As such, a decision maker can implement a better optimized technique to reduce a project duration under budget while reducing the risk of liquidated damages. The main contribution of this study is to apply managerial improvement of labor productivity to TCT optimization, the project duration can be reduced owing to improved productivity of existing crews rather than inefficient overmanning, overlapping or costly substitution. In the end, three important managerial insights are presented and future research is recommended.
引用
收藏
页码:113 / 130
页数:18
相关论文
共 50 条
[41]   Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off [J].
Yang, I-Tung ;
Lin, Yu-Cheng ;
Lee, Hsin-Yun .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
[42]   Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects [J].
Albayrak, Gulcag .
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) :1295-1307
[43]   An integrated multi-objective optimization model for solving the construction time-cost trade-off problem [J].
Koo, Choongwan ;
Hong, Taehoon ;
Kim, Sangbum .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) :323-333
[44]   Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis [J].
Gelisen, Gokhan ;
Griffis, F. H. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (04)
[45]   Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search [J].
Geem, Zong Woo .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06) :711-716
[46]   A genetic algorithm approach for the time-cost trade-off in PERT networks [J].
Azaron, A ;
Perkgoz, C ;
Sakawa, M .
APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) :1317-1339
[47]   Fuzzy-based MOGA approach to stochastic time-cost trade-off problem [J].
Eshtehardian, Ehsan ;
Afshar, Abbas ;
Abbasnia, Reza .
AUTOMATION IN CONSTRUCTION, 2009, 18 (05) :692-701
[48]   A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling [J].
Aghassi, Hadi ;
Abadi, Sedigheh Nader ;
Roghanian, Emad .
KNOWLEDGE TECHNOLOGY, 2012, 295 :356-+
[49]   Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem [J].
Sonmez, Rifat ;
Iranagh, Mahdi Abbasi ;
Uysal, Furkan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
[50]   Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer [J].
Zou, Haobo ;
Zhou, Guohua .
JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01) :197-207