AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY

被引:9
作者
Lin, Chien-Liang [1 ]
Lai, Yu-Che [1 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Construct Engn, Kaohsiung, Taiwan
关键词
labor productivity; time-cost trade-off; optimization; genetic algorithm; CONSTRUCTION; OPTIMIZATION; DESIGN; ACCELERATION;
D O I
10.3846/jcem.2020.11663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimization of the time-cost trade off (TCT) has received considerable attention for several decades. However, few studies have considered improving performance/productivity of existing crews. To shorten the gap to real-world applications, this study presents an improved TCT model that considers variable productivity using genetic algorithms (GAs). Through an illustrative case and a real world case, the results demonstrate that improving labor productivity of selected activities by allocating existing crews and management can yield an optimized solution. As such, a decision maker can implement a better optimized technique to reduce a project duration under budget while reducing the risk of liquidated damages. The main contribution of this study is to apply managerial improvement of labor productivity to TCT optimization, the project duration can be reduced owing to improved productivity of existing crews rather than inefficient overmanning, overlapping or costly substitution. In the end, three important managerial insights are presented and future research is recommended.
引用
收藏
页码:113 / 130
页数:18
相关论文
共 50 条
[21]   Solution of discrete time-cost trade-off problem with adaptive search domain [J].
Bettemir, Onder Halis ;
Birgonul, M. Talat .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) :1032-1052
[22]   Efficient modeling of time-cost trade-off problem by eliminating redundant paths [J].
Ammar, Mohammad A. .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) :812-821
[23]   Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01) :65-71
[24]   A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach [J].
Salari, Mostafa ;
Bagherpour, Morteza ;
Reihani, Mohammad Hossein .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (04) :1909-1919
[25]   Time-cost trade-off model in GERT-type network with characteristic function for project management [J].
Tao, Liangyan ;
Su, Xuebi ;
Javed, Saad Ahmed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
[26]   Time-Cost Trade-off Problems of Engineering Project with Running Income [J].
Li, Hongxian ;
Ouyang, Hongxiang .
2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, :9-+
[27]   Modeling project time-cost trade-off in fuzzy random environment [J].
Ke, Hua ;
Ma, Junjie .
APPLIED SOFT COMPUTING, 2014, 19 :80-85
[28]   A crashing-based time-cost trade-off model considering quality cost and contract clauses [J].
Akin, Firat Dogu ;
Polat, Gul ;
Turkoglu, Harun ;
Damci, Atilla .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 23 (06) :954-963
[29]   A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration [J].
Parveen, Sultana ;
Saha, Surajit Kumar .
International Journal of Industrial and Systems Engineering, 2013, 15 (02) :153-170
[30]   A fuzzy time-cost trade-off problem with credibility theory concepts [J].
Ke, Hua ;
Ma, Weimin .
PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 :258-262