AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY

被引:9
|
作者
Lin, Chien-Liang [1 ]
Lai, Yu-Che [1 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Construct Engn, Kaohsiung, Taiwan
关键词
labor productivity; time-cost trade-off; optimization; genetic algorithm; CONSTRUCTION; OPTIMIZATION; DESIGN; ACCELERATION;
D O I
10.3846/jcem.2020.11663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimization of the time-cost trade off (TCT) has received considerable attention for several decades. However, few studies have considered improving performance/productivity of existing crews. To shorten the gap to real-world applications, this study presents an improved TCT model that considers variable productivity using genetic algorithms (GAs). Through an illustrative case and a real world case, the results demonstrate that improving labor productivity of selected activities by allocating existing crews and management can yield an optimized solution. As such, a decision maker can implement a better optimized technique to reduce a project duration under budget while reducing the risk of liquidated damages. The main contribution of this study is to apply managerial improvement of labor productivity to TCT optimization, the project duration can be reduced owing to improved productivity of existing crews rather than inefficient overmanning, overlapping or costly substitution. In the end, three important managerial insights are presented and future research is recommended.
引用
收藏
页码:113 / 130
页数:18
相关论文
共 50 条
  • [1] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [2] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [3] Automated BIM schedule generation approach for solving time-cost trade-off problems
    ElMenshawy, Mohamed
    Marzouk, Mohamed
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (10) : 3346 - 3367
  • [4] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [5] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [6] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [7] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [8] New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities
    Kang, Namuk
    Son, Jaeho
    Lee, Seunghyun
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2015, 14 (02) : 379 - 386
  • [9] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [10] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off
    Kaveh, Ali
    Khanzadi, Mostafa
    Alipour, Majid
    Naraky, Mohammad Rajabi
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371