Project planning and monitoring analysis for sustainable environment and power infrastructure project development in Lagos State, Nigeria

被引:6
|
作者
Ogundari, Ibikunle Olalekan [1 ]
Otuyemi, Funso Ayotunde [2 ]
机构
[1] Obafemi Awolowo Univ, AISPI, Ife, Nigeria
[2] Univ Huddersfield, Sch Comp & Engn, Huddersfield, W Yorkshire, England
关键词
sustainable environment initiatives; power infrastructure; critical infrastructure; earned value management; EVM; Lagos; project planning and management; estimated completion time; estimate at completion; cost performance index; project schedule variance; Nigeria;
D O I
10.1504/IJCIS.2019.10016807
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study examined the project planning and control parameters for a public-private partnership sustainable environment and power (SEP) critical infrastructure project (waste-to-energy initiative) in Lagos State, Nigeria, taking into cognisance the state's critical infrastructure planning limitations, and the project's role as model for Nigeria's federal and state governments. State-approved project time and costs were 15 months and US$6 million dollars, respectively. Techno-economic and environmental conversion factors as well as project financial and work schedule data were obtained through literature, questionnaire and site inspection. Project assessment and earned value management (EVM) methodology were used. The results showed annual waste-to-energy generation potentials of 2.372.85 TWh for electricity and 4.75 TWh for district heating, electricity revenue of US$187.93-226.0 million, estimated cost at completion of $7.31 million, and estimated completion time of 17 months. The study concluded that in spite of the project being completed over budget and behind schedule, the SEP critical infrastructure project was viable and a suitable template for waste management in Nigeria.
引用
收藏
页码:24 / 45
页数:22
相关论文
共 50 条
  • [21] Strengthening Project Development in Developing Countries: Investigating the Infrastructure Enabling Environment through a Systems Analysis
    Boroto, David
    Fenner, Richard
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2024, 30 (04)
  • [22] Building integrated project and asset management teams for sustainable built infrastructure development
    Wong, Kelwin K. W.
    Kumaraswamy, Mohan
    Mahesh, Gangadhar
    Ling, Florence Y. Y.
    JOURNAL OF FACILITIES MANAGEMENT, 2014, 12 (03) : 187 - +
  • [23] Study of the Rural Infrastructure Project Evaluation Index System Based on Sustainable Development
    Hu, Yunxiang
    Sai, Yunxiu
    Li, Huimin
    Tian, Wei
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3088 - +
  • [24] Stakeholder-Sensitive Social Welfare-Oriented Benefit Analysis for Sustainable Infrastructure Project Development
    Mostafa, Mostafa A.
    El-Gohary, Nora M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (09)
  • [25] FINAL CONFERENCE OF THE CENTER FOR RESEARCH AND DEVELOPMENT OF A SAFE AND SUSTAINABLE BUILT ENVIRONMENT PROJECT Project "Borongaj Center"
    Vrancic, Tanja
    GRADEVINAR, 2022, 74 (09): : 799 - 803
  • [26] Sustainable transport project evaluation and decision support: indicators and planning criteria for sustainable development
    Salling, Kim Bang
    Pryn, Marie Ridley
    INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT AND WORLD ECOLOGY, 2015, 22 (04): : 346 - 357
  • [27] Leveraging Responsive Feedback to Redesign a Demand Generation Strategy: Experience From the IntegratE Project in Lagos State, Nigeria
    Okafor, Emeka Emmanuel
    Oladejo, Bolaji Gbenuade
    Alagbile, Michael
    Baruwa, Sikiru
    Ayinde, David O.
    Anyanti, Jennifer
    Akomolafe, Toyin O.
    GLOBAL HEALTH-SCIENCE AND PRACTICE, 2023, 11
  • [28] NYC DEP Green Infrastructure Research and Development Project: Monitoring Strategy and Protocols
    McLaughlin, John
    Urisaka, Miki
    Montalto, Franco
    Pasquel, Fernando
    Acosta, Valentina Paiva
    INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE 2017: TECHNOLOGY, 2017, : 270 - 281
  • [29] AGRICULTURAL PROJECT IMPLEMENTATION - A CASE-STUDY OF GUSAU AGRICULTURAL-DEVELOPMENT PROJECT, SOKOTO STATE, NIGERIA
    OKORIE, A
    AGRICULTURAL ADMINISTRATION, 1983, 12 (03): : 173 - 188
  • [30] Sustainable stakeholder participation planning on the basis of analysis of competing project interest
    Sivalingam, Chandhini
    Ramaswamy, Raju
    JOURNAL OF INTERNATIONAL FINANCIAL MANAGEMENT & ACCOUNTING, 2024, 35 (02)