Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups

被引:38
作者
Wang, Shasha [1 ]
Kurz, Mary [1 ]
Mason, Scott Jennings [1 ]
Rashidi, Eghbal [2 ]
机构
[1] Clemson Univ, Dept Ind Engn, Clemson, SC 29634 USA
[2] Santa Clara Univ, Leavey Sch Business, Santa Clara, CA 95053 USA
关键词
Batch scheduling; lot streaming; sequence-dependent setups; incompatible product family; hybrid flow shop; SCHEDULING PROBLEMS; MULTIPLE ORDERS; ALGORITHMS; FRAMEWORK; TIMES;
D O I
10.1080/00207543.2019.1571251
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A paint manufacturing firm's customers typically place orders for two or more products simultaneously. Each product belongs to a family that denotes batching compatibility during manufacturing. Further, products can be split into several sublots to allow overlapping production in a two-stage hybrid flow shop wherein various identical, capacitated machines operate in parallel at each stage. We present a mixed-integer linear program (MILP) for this integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number and size of sublots for each product and the production sequencing for each sublot such that the total weighted completion time is minimised. To promote practical implementation, we develop and evaluate heuristics to efficiently solve this problem.
引用
收藏
页码:6893 / 6907
页数:15
相关论文
共 30 条
[1]   Effective scheduling of a large-scale paint production system [J].
Adonyi, Robert ;
Biros, Gabor ;
Holczinger, Tibor ;
Friedler, Ferenc .
JOURNAL OF CLEANER PRODUCTION, 2008, 16 (02) :225-232
[2]  
Biskup D, 2006, J OPER RES SOC, V57, P296, DOI [10.1057/palgrave.jors.2602016, 10.1057/palgrave.jors.26020l6]
[3]   Flexible job shop scheduling with lot streaming and sublot size optimisation [J].
Bozek, Andrzej ;
Werner, Frank .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) :6391-6411
[4]   A review of lot streaming [J].
Cheng, M. ;
Mukherjee, N. J. ;
Sarin, S. C. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (23-24) :7023-7046
[5]   Jobshop lot streaming with routing flexibility, sequence-dependent setups, machine release dates and lag time [J].
Defersha, Fantahun M. ;
Chen, Mingyuan .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (08) :2331-2352
[6]   A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots [J].
Defersha, Fantahun M. ;
Chen, Mingyuan .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (06) :1705-1726
[7]   Multiple orders per job batch scheduling with incompatible jobs [J].
Erramilli, Vishnu ;
Mason, Scott J. .
ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) :245-260
[8]   Multiple orders per job compatible batch scheduling [J].
Erramilli, Vishnu ;
Mason, Scott J. .
IEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURING, 2006, 29 (04) :285-296
[9]   Lot streaming in a multiple product permutation flow shop with intermingling [J].
Feldmann, M. ;
Biskup, D. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (01) :197-216
[10]   Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time [J].
Han, Yuyan ;
Gong, Dunwei ;
Jin, Yaochu ;
Pan, Quan-ke .
APPLIED SOFT COMPUTING, 2016, 42 :229-245