In this paper, we consider parallel-machine scheduling with past-sequence-dependent (p-s-d) delivery times and deteriorating maintenance. The delivery time of a job is proportional to its waiting time in the system. Each machine has a deteriorating maintenance activity, i.e., delaying the maintenance increases the time required to perform it. We consider three versions of the problem to minimize the total absolute deviation of job completion times, the total load on all the machines, and the total completion time. We develop polynomial-time algorithms to solve them.
机构:
Shenyang Normal Univ, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R ChinaZhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Comp Sci & Informat Engn, Hangzhou 310018, Zhejiang, Peoples R China
Zhao, Chuanli
Ji, Min
论文数: 0引用数: 0
h-index: 0
机构:
Zhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Comp Sci & Informat Engn, Hangzhou 310018, Zhejiang, Peoples R ChinaZhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Comp Sci & Informat Engn, Hangzhou 310018, Zhejiang, Peoples R China
Ji, Min
Tang, Hengyong
论文数: 0引用数: 0
h-index: 0
机构:
Shenyang Normal Univ, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R ChinaZhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Comp Sci & Informat Engn, Hangzhou 310018, Zhejiang, Peoples R China
机构:
School of Management, Qufu Normal University, Rizhao, Shandong
School of Mathematical Sciences, Qufu Normal University, Qufu, ShandongSchool of Management, Qufu Normal University, Rizhao, Shandong
Zou J.
Zhang Y.
论文数: 0引用数: 0
h-index: 0
机构:
School of Management, Qufu Normal University, Rizhao, ShandongSchool of Management, Qufu Normal University, Rizhao, Shandong
Zhang Y.
Miao C.
论文数: 0引用数: 0
h-index: 0
机构:
School of Mathematical Sciences, Qufu Normal University, Qufu, ShandongSchool of Management, Qufu Normal University, Rizhao, Shandong