共 50 条
[41]
Optimization of Cycle Time in an Assembly Line Balancing Problem
[J].
1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016,
2016, 25
:1146-1153
[46]
Optimizing U-Shaped Production Line Balancing Problem with Exchangeable Task Locations and Walking Times
[J].
APPLIED SCIENCES-BASEL,
2022, 12 (07)
[47]
The assembly line balancing problem as an N-person game
[J].
INTELLIGENT ASSEMBLY AND DISASSEMBLY (IAD'98),
1998,
:41-46
[50]
Estimation of time and cost oriented assembly line balancing problem
[J].
ICSENG 2008: INTERNATIONAL CONFERENCE ON SYSTEMS ENGINEERING,
2008,
:248-253