Balancing just-in-time production units:: The N U-line balancing problem

被引:0
作者
Sparling, D [1 ]
机构
[1] Univ Guelph, Dept Agr Econ & Business, OAC, Guelph, ON N1G 2W1, Canada
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
U-shaped production lines are a common component of Just-In-Time systems. When several U-lines operate in close proximity, an opportunity exists to balance two or more U-lines together and reduce the total number of stations required to operate the facility. The concept of a JIT production unit, where a number of U-lines produce and assemble parts for the same product line, is introduced. The problem of balancing a JIT Production Unit is considered as the N U-line balancing problem considering travel. This problem is modelled and heuristic solution algorithms are presented for both the general case, where U-line locations are not fixed, and for the fixed location case. A subproblem, the problem of assigning tasks to stations which may include tasks from more than one U-line, provides new challenges for operations managers. This new problem is the multi-line station assignment problem. The benefits of multiple U-line balancing are examined in an empirical study.
引用
收藏
页码:215 / 237
页数:23
相关论文
共 50 条
[21]   An empirical comparison of improvement heuristics for the mixed-model U-line balancing problem [J].
Visich J.K. ;
Khumawala B.M. ;
Diaz-Saiz J. .
International Journal of Manufacturing Technology and Management, 2010, 20 (1-4) :25-45
[22]   Mixed model U-line balancing type-1 problem: A new approach [J].
Rabbani, Masoud ;
Kazemi, Seyed Mahmood ;
Manavizadeh, Neda .
JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) :131-138
[23]   A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives [J].
Toklu, Bilal ;
Oezcan, Ugor .
ENGINEERING OPTIMIZATION, 2008, 40 (03) :191-204
[24]   A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem [J].
Ozcan, Ugur ;
Kellegoz, Talip ;
Toklu, Bilal .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (06) :1605-1626
[25]   A DEA approach for comparing solution efficiency in U-line balancing problem using goal programming [J].
Hami Farkhondeh ;
Reza Hassanzadeh ;
Iraj Mahdavi ;
Nezam Mahdavi-Amiri .
The International Journal of Advanced Manufacturing Technology, 2012, 61 :1161-1172
[26]   An optimal piecewise-linear program for the U-line balancing problem with stochastic task times [J].
Urban, TL ;
Chiang, WC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :771-782
[27]   A DEA approach for comparing solution efficiency in U-line balancing problem using goal programming [J].
Farkhondeh, Hami ;
Hassanzadeh, Reza ;
Mahdavi, Iraj ;
Mahdavi-Amiri, Nezam .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (9-12) :1161-1172
[28]   A DEA approach for comparing solution efficiency in U-line balancing problem using goal programming [J].
Mahdavi, I. (irajarash@rediffmail.com), 1600, Springer London (61) :9-12
[29]   A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem [J].
Lian, Kunlei ;
Zhang, Chaoyong ;
Gao, Liang ;
Shao, Xinyu .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :5117-5131
[30]   Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments [J].
Kara, Yakup .
ENGINEERING OPTIMIZATION, 2008, 40 (07) :669-684