Reliability interval for a stochastic project network constrained by budget and time

被引:3
|
作者
Lin, Yi-Kuei [1 ]
Chang, Ping-Chen [2 ]
Cho, Yun-Ling [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[2] Natl Quemoy Univ, Dept Ind Engn & Management, Jinning, Kinmen County, Taiwan
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2019年 / 16卷 / 01期
关键词
Stochastic project network; project reliability interval; budget; time constraint; disaster recovery system (DRS); sensitivity analysis; SCHEDULING PROBLEM; UNCERTAINTY; MANAGEMENT; COMPLEXITY; ALGORITHM;
D O I
10.1080/16843703.2017.1369651
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a project, duration and cost of activities are stochastic in nature due to uncertainties (natural disaster and human factors). Thus, a project is commonly modeled as a stochastic project network (SPN). For a project manager, it is a duty to manage both efficiency and effectiveness of an SPN. To achieve this goal, this paper develops a procedure to derive project reliability interval for an SPN. The project reliability interval is a performance indicator to assess the probability of project completion under budget and time constraints. Such an indicator provides project manager a quantitative measurement and a qualitative implication to decide a reasonable completion time and budget for an SPN. Quantitative measurement shows the efficiency of budget and time consumption to complete a project; while qualitative implication provides the effectiveness after implementing a project. A practical project of disaster recovery system is utilized to demonstrate how the project reliability interval is applicable in the real life. Sensitivity analysis is further implemented to investigate the project reliability interval under various constraints of project time and budget.
引用
收藏
页码:82 / 94
页数:13
相关论文
共 50 条
  • [31] An Uncertainty Tolerant Approach For Stochastic Resource Constrained Project Scheduling Problems
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    2019 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON), 2019,
  • [32] Two-stage interval stochastic chance-constrained robust programming and its application in flood management
    Ding, Xiaowen
    Hua, Dongxu
    Jiang, Guihong
    Bao, Zhengfeng
    Yu, Lei
    JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 908 - 918
  • [33] An Enhanced MILP Model for Multistage Reliability-Constrained Distribution Network Expansion Planning
    Jooshaki, Mohammad
    Abbaspour, Ali
    Fotuhi-Firuzabad, Mahmud
    Munoz-Delgado, Gregorio
    Contreras, Javier
    Lehtonen, Matti
    Arroyo, Jose M.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2022, 37 (01) : 118 - 131
  • [34] Reliability-oriented distribution network reconfiguration considering uncertainties of data by interval analysis
    Zhang, Peng
    Li, Wenyuan
    Wang, Shouxiang
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 34 (01) : 138 - 144
  • [35] A model for time- and budget-constrained activity demand analysis
    Kockelman, KM
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2001, 35 (03) : 255 - 269
  • [36] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Lamas, Patricio
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (04) : 409 - 428
  • [37] A simple recursive importance and stratified sampling scheme for stochastic network reliability estimation
    Yang, Wei-Ning
    Shih, Wei-Ling
    Yeh, Jih Chun
    SIMULATION MODELLING PRACTICE AND THEORY, 2012, 29 : 137 - 148
  • [38] An analysis of network and resource indicators for resource-constrained project scheduling problem instances
    Vanhoucke, Mario
    Coelho, Jose
    COMPUTERS & OPERATIONS RESEARCH, 2021, 132
  • [39] Stochastic resource-constrained project scheduling problem with time varying weather conditions and an improved estimation of distribution algorithm
    Zhou, Yifan
    Miao, Jindan
    Yan, Bin
    Zhang, Zhisheng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157 (157)
  • [40] Estimated system reliability of a cloud computing network subject to maintenance budget
    Lin, Yi-Kuei
    Chang, Ping-Chen
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2012, 35 (03) : 321 - 328