Reliability interval for a stochastic project network constrained by budget and time

被引:3
|
作者
Lin, Yi-Kuei [1 ]
Chang, Ping-Chen [2 ]
Cho, Yun-Ling [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[2] Natl Quemoy Univ, Dept Ind Engn & Management, Jinning, Kinmen County, Taiwan
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2019年 / 16卷 / 01期
关键词
Stochastic project network; project reliability interval; budget; time constraint; disaster recovery system (DRS); sensitivity analysis; SCHEDULING PROBLEM; UNCERTAINTY; MANAGEMENT; COMPLEXITY; ALGORITHM;
D O I
10.1080/16843703.2017.1369651
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a project, duration and cost of activities are stochastic in nature due to uncertainties (natural disaster and human factors). Thus, a project is commonly modeled as a stochastic project network (SPN). For a project manager, it is a duty to manage both efficiency and effectiveness of an SPN. To achieve this goal, this paper develops a procedure to derive project reliability interval for an SPN. The project reliability interval is a performance indicator to assess the probability of project completion under budget and time constraints. Such an indicator provides project manager a quantitative measurement and a qualitative implication to decide a reasonable completion time and budget for an SPN. Quantitative measurement shows the efficiency of budget and time consumption to complete a project; while qualitative implication provides the effectiveness after implementing a project. A practical project of disaster recovery system is utilized to demonstrate how the project reliability interval is applicable in the real life. Sensitivity analysis is further implemented to investigate the project reliability interval under various constraints of project time and budget.
引用
收藏
页码:82 / 94
页数:13
相关论文
共 50 条
  • [21] Capacity Reliability Calculation and Sensitivity Analysis for a Stochastic Transport Network
    Niu, Yi-Feng
    Xu, Xiu-Zhen
    He, Can
    Ding, Dong
    Liu, Zhi-Zhong
    IEEE ACCESS, 2020, 8 (133161-133169) : 133161 - 133169
  • [22] A Hybrid Stochastic/Interval Approach to Transmission-Constrained Unit Commitment
    Dvorkin, Yury
    Pandzic, Hrvoje
    Ortega-Vazquez, Miguel A.
    Kirschen, Daniel S.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (02) : 621 - 631
  • [23] Reliability of k Separate Minimal Paths Under Both Time and Budget Constraints
    Lin, Yi-Kuei
    IEEE TRANSACTIONS ON RELIABILITY, 2010, 59 (01) : 183 - 190
  • [24] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    Journal of Scheduling, 2018, 21 : 349 - 365
  • [25] Reliability of time-constrained multi-state network susceptible to correlated component faults
    Lin, Yi-Kuei
    Fiondella, Lance
    Chang, Ping-Chen
    ANNALS OF OPERATIONS RESEARCH, 2022, 311 (01) : 239 - 254
  • [26] Reliability evaluation and big data analytics architecture for a stochastic flow network with time attribute
    Chang, Ping-Chen
    ANNALS OF OPERATIONS RESEARCH, 2022, 311 (01) : 3 - 18
  • [27] Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
    Ballestin, Francisco
    Leus, Roel
    PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) : 459 - 474
  • [28] Reliability-driven scheduling of time/cost-constrained grid workflows
    Kianpisheh, Somayeh
    Charkari, Nasrolah Moghadam
    Kargahi, Mehdi
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2016, 55 : 1 - 16
  • [29] Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
    Li, Hongbo
    Xu, Zhe
    Xiong, Li
    Liu, Yinbin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [30] System reliability evaluation using budget constrained real d-MC search
    Kumari, Suchi
    Namasudra, Suyel
    COMPUTER COMMUNICATIONS, 2021, 171 : 10 - 15