Reliability interval for a stochastic project network constrained by budget and time

被引:3
|
作者
Lin, Yi-Kuei [1 ]
Chang, Ping-Chen [2 ]
Cho, Yun-Ling [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[2] Natl Quemoy Univ, Dept Ind Engn & Management, Jinning, Kinmen County, Taiwan
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2019年 / 16卷 / 01期
关键词
Stochastic project network; project reliability interval; budget; time constraint; disaster recovery system (DRS); sensitivity analysis; SCHEDULING PROBLEM; UNCERTAINTY; MANAGEMENT; COMPLEXITY; ALGORITHM;
D O I
10.1080/16843703.2017.1369651
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a project, duration and cost of activities are stochastic in nature due to uncertainties (natural disaster and human factors). Thus, a project is commonly modeled as a stochastic project network (SPN). For a project manager, it is a duty to manage both efficiency and effectiveness of an SPN. To achieve this goal, this paper develops a procedure to derive project reliability interval for an SPN. The project reliability interval is a performance indicator to assess the probability of project completion under budget and time constraints. Such an indicator provides project manager a quantitative measurement and a qualitative implication to decide a reasonable completion time and budget for an SPN. Quantitative measurement shows the efficiency of budget and time consumption to complete a project; while qualitative implication provides the effectiveness after implementing a project. A practical project of disaster recovery system is utilized to demonstrate how the project reliability interval is applicable in the real life. Sensitivity analysis is further implemented to investigate the project reliability interval under various constraints of project time and budget.
引用
收藏
页码:82 / 94
页数:13