Full-infinite interval two-stage credibility constrained programming for electric power system management by considering carbon emission trading

被引:18
作者
Gong, J. W. [1 ]
Li, Y. P. [2 ]
Suo, C. [1 ]
机构
[1] North China Elect Power Univ, Sino Canada Resources & Environm Res Acad, Beijing 102206, Peoples R China
[2] Beijing Normal Univ, Sch Environm, Beijing 100875, Peoples R China
基金
北京市自然科学基金;
关键词
Electric power system; Carbon emission trading; Full-infinite interval two-stage credibility constrained programming (FITCP); Uncertainty; WATER-RESOURCES MANAGEMENT; QUANTITY COMPETITION; OPTIMIZATION MODEL; ENERGY SYSTEM; GAS EMISSIONS; UNCERTAINTY; PRICE; CHINA; PERFORMANCE; SUPERGAMES;
D O I
10.1016/j.ijepes.2018.08.028
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this study, a full-infinite interval two-stage credibility constrained programming (FITCP) method is developed for optimizing electric power system (EPS) by considering CO2 mitigation and air pollutant emission control. Through integrating full-infinite programming (FIP), interval two-stage programming (ITSP) and credibility constrained programming (CCP) within a general framework, the developed FITCP method can tackle multiple uncertainties in terms of interval values (both crisp and functional interval values), probabilistic and possibilistic distributions. Then, a FITCP-based electric power system (FITCP-EPS) model has been formulated for EPS planning where carbon emission trading (CET) scheme and air pollutant emission limitation are introduced to cope with the problem of carbon and air pollutant mitigation. Scenarios in response to diverse carbon mitigation levels, different trading schemes and different environmental policies are generated. Moreover, sensitive analysis and value of information analysis are conducted to help decision makers to have a clear view of the effects of data variation and uncertainty data collection. Results reveal that (i) CET scheme can bring more economic benefits for power plants especially when mitigation level is high; (ii) whether the CET is carried out or not, a corresponding construction of carbon capture and storage infrastructure should be implemented to achieve the mitigation target; (iii) the expected system benefit would increase [0, 2.17] % by resolving the uncertainty of CO2 emission levels. The results also indicate that FITCP-EPS model can not only provide an effective linkage between the pre-regulated generation targets and environmental policies, but also generate more decision options under different credibility levels and CO2 emission levels, which are useful for helping decision makers to make appropriate generation targets, plan electricity generation mix, as well as gain in-depth insight into the effects of carbon emission trading and pollutant control on EPS.
引用
收藏
页码:440 / 453
页数:14
相关论文
共 54 条
[1]   Improving the modified interval linear programming method by new techniques [J].
Allandadi, Mehdi ;
Nehi, Hasan Mishmast ;
Ashayerinasab, Hasan Ali ;
Javanmard, Moslem .
INFORMATION SCIENCES, 2016, 339 :224-236
[2]  
[Anonymous], 2017, World energy outlook
[3]  
[Anonymous], 2018, STAT REV WORLD EN 20
[4]   A multiple objective mixed integer linear programming model for power generation expansion planning [J].
Antunes, CH ;
Martins, AG ;
Brito, IS .
ENERGY, 2004, 29 (04) :613-627
[5]   Efficiency of the EU regulation on greenhouse gas emissions in Italy: The hierarchical cluster analysis approach [J].
Arbolino, Roberta ;
Carlucci, Fabio ;
Cira, Andrea ;
Ioppolo, Giuseppe ;
Yigitcanlar, Tan .
ECOLOGICAL INDICATORS, 2017, 81 :115-123
[6]   2-stage robust MILP with continuous recourse variables [J].
Billionnet, Alain ;
Costa, Marie-Christine ;
Poirion, Pierre-Louis .
DISCRETE APPLIED MATHEMATICS, 2014, 170 :21-32
[7]   Identification of optimal strategies for energy management systems planning under multiple uncertainties [J].
Cai, Y. P. ;
Huang, G. H. ;
Yang, Z. F. ;
Tan, Q. .
APPLIED ENERGY, 2009, 86 (04) :480-495
[8]   Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm [J].
Chaharsooghi, S. Kamal ;
Honarvar, Mahboobeh ;
Modarres, M. ;
Kamalabadi, Isa Nakhai .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) :1086-1097
[9]   A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty [J].
Chen, W. T. ;
Li, Y. P. ;
Huang, G. H. ;
Chen, X. ;
Li, Y. F. .
APPLIED ENERGY, 2010, 87 (03) :1033-1047
[10]   Supply function vs. quantity competition in supergames [J].
Ciarreta, Aitor ;
Gutierrez-Hita, Carlos .
INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2006, 24 (04) :773-783