Power to gas-electrochemical industry hybrid systems: A case study

被引:35
作者
Bailera, Manuel [1 ]
Espatolero, Sergio [2 ]
Lisbona, Pilar [3 ]
Romeo, Luis M. [1 ]
机构
[1] Univ Zaragoza, Escuela Ingn & Arquitectura, Campus Rio Ebro,Maria de Luna 3, Zaragoza 50078, Spain
[2] Res Ctr Energy Resources & Consumpt CIRCE, CIRCE Bldg,Campus Rio Ebro, Zaragoza 50018, Spain
[3] Univ Valladolid, Escuela Univ Ingn Agr Soria, Campus Univ Duques Soria, Soria 42004, Spain
关键词
Power-to-gas; Methanation; Hybridization; Electrochemical industry; RENEWABLE ENERGY; CO2; CAPTURE; TO-GAS; STORAGE; PLANTS; CYCLE;
D O I
10.1016/j.apenergy.2017.05.177
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Several researchers have proposed in literature different Power to Gas (PtG) hybridizations to improve the efficiency of this energy storage technology. Some of the synergies of this hybrid systems are already being tested under real conditions (e.g. PtG-Amine scrubbing, PtG-wastewater treatment) while others have only been studied through numerical simulations (e.g., PtG-oxyfuel combustion). Here, a novel hybridization between Power to Gas and electrochemical industries is proposed for the first time. This PtG-Electrochemical hybridization avoids to implement the typical water electrolysis stage of PtG since hydrogen is already available in the plant. This study thoroughly analyzes the implementation of Power to Gas in a real electrochemical plant that sub-produces hydrogen from the lines of production of chlorate, chlorine, and potassium hydroxide. It is shown that the required carbon dioxide for methanation can be captured from the flue gas of the factory's boilers without additional energy penalty thanks to energy integration. The methanation plant has been designed according to the H-2 and CO2 availability, taking into account the number of operating hours and the degree of usage of by-products. Results show that this PtG hybridization could operate more than 6000 h per year at large scale concepts (nominal H-2 inputs of 2000 m(3)/h (NTP)), which represents 2000 h more than pilot/commercial demonstrations of classic PtG concepts. Besides, a detailed economic analysis demonstrates the economic feasibility of the system under current scenarios. It is shown that the capital investment would be recovered in 8 years, generating a 4.8 M(sic) NPV at the end of the project lifetime. Thus, this work presents a suitable way to avoid the subsidy dependency that current PtG research projects have. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:435 / 446
页数:12
相关论文
共 38 条
[1]   CO2 capture from power plants -: Part II.: A parametric study of the economical performance based on mono-ethanolamine [J].
Abu-Zahra, Mohammad R. M. ;
Niederer, John P. M. ;
Feron, Paul H. M. ;
Versteeg, Geert F. .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2007, 1 (02) :135-142
[2]   CO2 capture from power plants.: Part I.: A parametric study of the technical-performance based on monoethanolamine [J].
Abu-Zahra, Mohammad R. M. ;
Schneiders, Leon H. J. ;
Niederer, John P. M. ;
Feron, Paul H. M. ;
Versteeg, Geert F. .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2007, 1 (01) :37-46
[3]  
Adamsen APS, 2013, WORK PROMOT
[4]  
Ali S.M., 2006, WORLD HYDR EN C LYON
[5]   Simulation of CO2 capture using MEA scrubbing:: a flowsheet decomposition method [J].
Alie, C ;
Backham, L ;
Croiset, E ;
Douglas, PL .
ENERGY CONVERSION AND MANAGEMENT, 2005, 46 (03) :475-487
[6]  
Alie C., 2004, CO2 CAPTURE MEA INTE
[7]  
[Anonymous], 2016, EU Reference Scenario 2016, DOI [10.2833/9127, DOI 10.2833/9127]
[8]  
[Anonymous], CEDEC GAS DAY 2014
[9]  
[Anonymous], 2007, BOE, V234, P39690
[10]  
[Anonymous], 2014, 1E724442014