Integrated cost, quality, risk and schedule control through earned value management (EVM)

被引:14
作者
Khesal, Tahereh [1 ]
Saghaei, Abbas [1 ]
Khalilzadeh, Mohammad [1 ]
Galankashi, Masoud Rahiminezhad [2 ]
Soltani, Roya [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Tehran, Iran
[2] Univ Teknol Malaysia, Skudai, Malaysia
关键词
Project management; Quality management; Risk management; Taguchi loss function; Earned value management; PROJECT; PERFORMANCE; SENSITIVITY; INFORMATION; PREDICTION; EXTENSION; MODEL;
D O I
10.1108/JEDT-07-2018-0119
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects. Design/methodology/approach This study represents a new EVM framework by considering a quality control index. Particularly, some control indices and cumulative buffers are defined by two proposed, methods, namely the linear- and Taguchi-based methods. These methods are implemented in three different projects in different industries. Findings According to the results, integration of the quality index creates a better control situation by providing more accurate information. Hence, project managers could comprehensively monitor the status of important factors to make more precise decisions while maintaining the simplicity of their analysis. Originality/value From the methodological and theoretical features, this paper offers new visions because, to the best of authors' knowledge, no comparable study has been conducted before.
引用
收藏
页码:183 / 203
页数:21
相关论文
共 38 条
[12]   The Application of Improved Earned Value Model in Engineering Quality and Progress Coordination Management [J].
Gao, Xukuo ;
Ye, Zhiming .
FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 :4580-4584
[13]   A Review on Possible Approaches for Detecting Early Warning Signs in Projects [J].
Haji-Kazemi, Sara ;
Andersen, Bjorn ;
Krane, Hans Petter .
PROJECT MANAGEMENT JOURNAL, 2013, 44 (05) :55-69
[14]  
Henderson K, 2007, P PMI GLOB C AS PAC
[15]  
Henderson K., 2004, Meas News, V2004, P15
[16]  
Henderson K., 2003, Meas News, V1, P13
[17]   Extensions of earned value management: Using the earned incentive metric to improve signal quality [J].
Kerkhove, L. -P. ;
Vanhoucke, M. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) :148-168
[18]   EDM: Earned Duration Management, a new approach to schedule performance management and measurement [J].
Khamooshi, Homayoun ;
Golafshani, Hamed .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (06) :1019-1041
[19]   Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items [J].
Khodakarami, Vahid ;
Abdi, Abdollah .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (07) :1233-1245
[20]   Integrating Risk Assessment and Actual Performance for Probabilistic Project Cost Forecasting: A Second Moment Bayesian Model [J].
Kim, Byung-Cheol .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2015, 62 (02) :158-170