Integrated cost, quality, risk and schedule control through earned value management (EVM)

被引:14
作者
Khesal, Tahereh [1 ]
Saghaei, Abbas [1 ]
Khalilzadeh, Mohammad [1 ]
Galankashi, Masoud Rahiminezhad [2 ]
Soltani, Roya [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Tehran, Iran
[2] Univ Teknol Malaysia, Skudai, Malaysia
关键词
Project management; Quality management; Risk management; Taguchi loss function; Earned value management; PROJECT; PERFORMANCE; SENSITIVITY; INFORMATION; PREDICTION; EXTENSION; MODEL;
D O I
10.1108/JEDT-07-2018-0119
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects. Design/methodology/approach This study represents a new EVM framework by considering a quality control index. Particularly, some control indices and cumulative buffers are defined by two proposed, methods, namely the linear- and Taguchi-based methods. These methods are implemented in three different projects in different industries. Findings According to the results, integration of the quality index creates a better control situation by providing more accurate information. Hence, project managers could comprehensively monitor the status of important factors to make more precise decisions while maintaining the simplicity of their analysis. Originality/value From the methodological and theoretical features, this paper offers new visions because, to the best of authors' knowledge, no comparable study has been conducted before.
引用
收藏
页码:183 / 203
页数:21
相关论文
共 38 条
[1]   Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques [J].
Acebes, Fernando ;
Pereda, Maria ;
Poza, David ;
Pajares, Javier ;
Manuel Galan, Jose .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) :1597-1609
[2]   Estimated Cost at Completion: Integrating Risk into Earned Value Management [J].
Babar, Suqrat ;
Thaheem, Muhammad Jamaluddin ;
Ayub, Bilal .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
[3]   Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (01) :28-43
[4]   Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) :1588-1596
[5]  
Binder J., 2016, GLOBAL PROJECT MANAG, DOI DOI 10.4324/9781315584997
[6]   A Bayesian Approach to Improve Estimate at Completion in Earned Value Management [J].
Caron, Franco ;
Ruggeri, Fabrizio ;
Merli, Alessandro .
PROJECT MANAGEMENT JOURNAL, 2013, 44 (01) :3-16
[7]   A comparison of the performance of various project control methods using earned value management systems [J].
Colin, Jeroen ;
Vanhoucke, Mario .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) :3159-3175
[8]   Setting tolerance limits for statistical project control using earned value management [J].
Colin, Jeroen ;
Vanhoucke, Mario .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 49 :107-122
[9]  
Czarnigowska A., 2011, International Journal of Business and Management Studies, V3, P11
[10]   Earned value-based performance monitoring of facility construction projects [J].
De Marco, Alberto ;
Narbaev, Timur .
JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (01) :69-+