共 50 条
- [24] Long-term performance research on reinforced concreted beams with pre-stressed CFRP ISAB-2010 - FIRST INTERNATIONAL SYMPOSIUM ON ARCHIMEDES BRIDGE, 2010, 4 : 341 - 346
- [25] Experimental study on bearing capacity of dangerous and/or old pre-stressed concrete box girders Gongcheng Lixue/Engineering Mechanics, 2019, 36 (08): : 171 - 181
- [26] Flexural property of string beam of pre-stressed glulam based on influence of regulation and control SDHM Structural Durability and Health Monitoring, 2019, 13 (02): : 143 - 179
- [27] Study on a PZT Actuator Based on Pre-stressed Mechanism 2008 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS, VOLS 1-3, 2008, : 722 - +
- [28] Whole-span and Whole length Pre-stress Loss Monitoring Technique Study in Bonded Pre-stressed System APPLIED MECHANICS AND CIVIL ENGINEERING II, 2012, 188 : 144 - +
- [29] Experiment research of flexural behavior of reinforced RC beams strengthened with the external prestressed CFRP plates INTELLIGENT SYSTEM AND APPLIED MATERIAL, PTS 1 AND 2, 2012, 466-467 : 225 - 228
- [30] Calculation Methods for Flexural Capacity of Normal Section of Concrete Beams Strengthened with Prestressed CFRP Plates CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 632 - 635