Scheduling arrivals to a production system in a fuzzy environment

被引:9
作者
Stanfield, PM [1 ]
King, RE [1 ]
Joines, JA [1 ]
机构
[1] N CAROLINA STATE UNIV,DEPT IND ENGN,RALEIGH,NC 27695
基金
美国国家科学基金会;
关键词
scheduling theory; fuzzy sets;
D O I
10.1016/0377-2217(95)00117-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A frequently encountered scheduling problem is to determine a material and job ready time while simultaneously finding a production sequence given customer-specified due dates. Often the production times and due dates are vague. This paper presents an investigation of scheduling ready times for a set of jobs with fuzzy service times and due dates. The ready time is constrained in that the possibility that a job is late must not exceed a predefined value. The objective in such an instance is to maximize the ready time without violating these constraints. The steps necessary to determine the maximum ready time and cases in which this effort may be significantly reduced are presented for single machine and flow shop production systems. Finally, a branch and bound technique is developed for cases in which the optimal job sequence cannot be determined a priori.
引用
收藏
页码:75 / 87
页数:13
相关论文
共 24 条
[1]  
[Anonymous], APPL FUZZY SET METHO
[2]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[3]  
Baker K. R., 1974, INTRO SCHEDULING SEQ
[4]   OPAL - A MULTI-KNOWLEDGE-BASED SYSTEM FOR INDUSTRIAL JOB-SHOP SCHEDULING [J].
BENSANA, E ;
BEL, G ;
DUBOIS, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (05) :795-819
[5]   ABOUT MEMBERSHIP FUNCTIONS ESTIMATION [J].
DISHKANT, H .
FUZZY SETS AND SYSTEMS, 1981, 5 (02) :141-147
[6]   MEMBERSHIP FUNCTIONS, SOME MATHEMATICAL-PROGRAMMING MODELS AND PRODUCTION SCHEDULING [J].
DUMITRU, V ;
LUBAN, F .
FUZZY SETS AND SYSTEMS, 1982, 8 (01) :19-33
[7]   ONE MACHINE SCHEDULING PROBLEM WITH FUZZY DUEDATES [J].
HAN, SS ;
ISHII, H ;
FUJII, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 79 (01) :1-12
[8]  
HODGSON TJ, 1992, 925 NCSUIE
[9]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[10]   2 SCHEDULING PROBLEMS WITH FUZZY DUE-DATES [J].
ISHII, H ;
TADA, M ;
MASUDA, T .
FUZZY SETS AND SYSTEMS, 1992, 46 (03) :339-347