Sequence-dependent group scheduling problem on unrelated-parallel machines

被引:31
作者
Bozorgirad, Mir Abbas [1 ]
Logendran, Rasaratnam [1 ]
机构
[1] Oregon State Univ, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
基金
美国国家科学基金会;
关键词
Group scheduling; Unrelated-parallel machines; Bi-criteria; Sequence-dependent setup time; Mixed-integer linear programming; Tabu search; TOTAL WEIGHTED TARDINESS; FLEXIBLE FLOW SHOPS; SETUP TIMES; TABU SEARCH; COSTS; JOBS;
D O I
10.1016/j.eswa.2012.02.032
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this research we address a sequence-dependent group scheduling problem on a set of unrelated-parallel machines where the run time of each job differs on different machines. To benefit both producer and customers we attempt to minimize a linear combination of total weighted completion time and total weighted tardiness. Since the problem is shown to be NP-hard, meta-heuristic algorithms based on tabu search are developed to find the optimal/near optimal solution. For some small size yet complex problems, the results from these algorithms are compared to the optimal solutions found by CPLEX. The result obtained in all of these problems is that the tabu search algorithms could find solutions at least as good as CPLEX but in drastically shorter computational time, thus signifying the high degree of efficiency and efficacy attained by the former. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:9021 / 9030
页数:10
相关论文
共 45 条
  • [1] An agent-based approach for scheduling multiple machines
    Akkiraju, R
    Keskinocak, P
    Murthy, S
    Wu, F
    [J]. APPLIED INTELLIGENCE, 2001, 14 (02) : 135 - 144
  • [2] A survey of scheduling problems with setup times or costs
    Allahverdi, Ali
    Ng, C. T.
    Cheng, T. C. E.
    Kovalyov, Mikhail Y.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 985 - 1032
  • [3] [Anonymous], R VERS 2 13 0
  • [4] [Anonymous], 2009, DESIGN ANAL EXPT
  • [5] [Anonymous], 2009, ILOG CPLEX OPT STUD
  • [6] [Anonymous], 1997, TABU SEARCH
  • [7] Arnaout J. -P., 2006, International Journal of Operations Research, V3, P136
  • [8] Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints
    Chen, JF
    Wu, TH
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2006, 34 (01): : 81 - 89
  • [9] DATAFIT, 1995, DATAFIT VERS 7 1 44
  • [10] A bicriteria flowshop scheduling with a learning effect
    Eren, Tamer
    Guner, Ertan
    [J]. APPLIED MATHEMATICAL MODELLING, 2008, 32 (09) : 1719 - 1733