CIVIL ENGINEERING
|
2005年
/
75卷
/
05期
关键词:
D O I:
10.1061/ciegag.0000018
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths of 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing.