6TiSCH Low Latency Autonomous Scheduling for Industrial Internet of Things

被引:11
作者
Pradhan, Nilam M. [1 ]
Chaudhari, Bharat S. [1 ]
Zennaro, Marco [2 ]
机构
[1] Maharashtra Inst Technol, Dept Elect & Telecommun Engn, Pune, Maharashtra, India
[2] Abdus Salam Int Ctr Theoret Phys, Sci Technol & Innovat Unit, I-34151 Trieste, Italy
关键词
Job shop scheduling; Schedules; Industrial Internet of Things; Reliability; IEEE; 802; 15; Standard; Quality of service; Standards; 6TiSCH; autonomous scheduling; industrial IoT; latency; RPL; TSCH; IEEE; 802.15.4E; PERFORMANCE; MANAGEMENT; NETWORKS;
D O I
10.1109/ACCESS.2022.3188862
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the advancements in the Internet of Things (IoT), machine-to-machine communication, big-data, and the associated environment, a new model of the Industrial Internet of Things (IIoT) has emerged. The IIoT brings sensors, intelligent machines and tools, instruments, and analytics together for applications like manufacturing, robotics, and many others. Most of these applications require adaptive and autonomous behavior, Quality of Service (QoS), efficient resource allocation, and reservation. One of these crucial challenges is to build and maintain a data communication schedule. Time Slotted Channel Hopping (TSCH) based network operation promises required QoS for low-power applications and enables high reliability. 6TiSCH layer is being developed by standardizing the protocol stack to achieve industrial performance requirements by using IPv6 over IEEE802.15.4e TSCH MAC. 6TiSCH aims to manage the schedule and configure it with the topology and traffic requirements in the industrial environment. This paper proposes a novel low latency autonomous scheduling scheme for the 6TiSCH networks. It generates a segmented schedule for the network where all source nodes can send application data packets to the root node in a single slotframe. The performance of the proposed technique is compared with existing scheduling techniques. Our scheme outperforms the other techniques. The result shows that the latency is reduced up to 41% in comparison with the other scheduling schemes. The proposed scheme has a lower radio duty cycle as the node's ON time is reduced, making it more energy efficient and reliable.
引用
收藏
页码:71566 / 71575
页数:10
相关论文
共 50 条
[21]   Key Performance Indicators of the Reference 6TiSCH Implementation in Internet-of-Things Scenarios [J].
Vucinic, Malisa ;
Chang, Tengfei ;
Skrbic, Bozidar ;
Kocan, Enis ;
Pejanovic-Djurisic, Milica ;
Watteyne, Thomas .
IEEE ACCESS, 2020, 8 :79147-79157
[22]   Distributed cell selection for scheduling function in 6TiSCH networks [J].
Thang Phan Duy ;
Thanh Dinh ;
Kim, Younghan .
COMPUTER STANDARDS & INTERFACES, 2017, 53 :80-88
[23]   Packet Aggregation-Based Scheduling in 6TiSCH Networks [J].
Vasiljevic, Dragan ;
Gardasevic, Gordana .
PROCEEDINGS OF 18TH INTERNATIONAL CONFERENCE ON SMART TECHNOLOGIES (IEEE EUROCON 2019), 2019,
[24]   DeSSR: A Decentralized, Broadcast-Based Scalable Scheduling Reservation Protocol for 6TiSCH Networks [J].
Kumar, Kaushal ;
Kolberg, Mario .
IEEE INTERNET OF THINGS JOURNAL, 2024, 11 (07) :12728-12744
[25]   3MSF: A Multi-Modal Adaptation of the 6TiSCH Minimal Scheduling Function for the Industrial IoT [J].
Elsas, Robbe ;
Van Leemput, Dries ;
Hoebeke, Jeroen ;
De Poorter, Eli .
SENSORS, 2024, 24 (08)
[26]   Content Centric Cross-Layer Scheduling for Industrial IoT Applications Using 6TiSCH [J].
Jin, Yichao ;
Raza, Usman ;
Aijaz, Adnan ;
Sooriyabandara, Mahesh ;
Gormus, Sedat .
IEEE ACCESS, 2018, 6 :234-244
[27]   Thorough Performance Evaluation & Analysis of the 6TiSCH Minimal Scheduling Function (MSF) [J].
David Hauweele ;
Remous-Aris Koutsiamanis ;
Bruno Quoitin ;
Georgios Z. Papadopoulos .
Journal of Signal Processing Systems, 2022, 94 :3-25
[28]   Thorough Performance Evaluation & Analysis of the 6TiSCH Minimal Scheduling Function (MSF) [J].
Hauweele, David ;
Koutsiamanis, Remous-Aris ;
Quoitin, Bruno ;
Papadopoulos, Georgios Z. .
JOURNAL OF SIGNAL PROCESSING SYSTEMS FOR SIGNAL IMAGE AND VIDEO TECHNOLOGY, 2022, 94 (01) :3-25
[29]   Multipath Scheduling for Energy Balancing and Reliable Transmission over 6TiSCH WSN [J].
Yoo, Donghwa ;
Chung, Sanghwa ;
Ha, Yuvin .
2019 ELEVENTH INTERNATIONAL CONFERENCE ON UBIQUITOUS AND FUTURE NETWORKS (ICUFN 2019), 2019, :555-560
[30]   Energy-Aware Adaptive Scheduling for Battery-Less 6TiSCH Routers in Industrial Wireless Sensor Networks [J].
van Leemput, Dries ;
Famaey, Jeroen ;
Hoebeke, Jeroen ;
de Poorter, Eli .
IEEE ACCESS, 2024, 12 :180034-180047