Stochastic assembly line balancing using beam search

被引:66
作者
Erel, E [1 ]
Sabuncuoglu, I
Sekerci, H
机构
[1] Bilkent Univ, Dept Management, TR-06800 Ankara, Turkey
[2] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
关键词
assembly line balancing; U-type assembly line; beam search;
D O I
10.1080/00207540412331320526
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a beam search-based method for the stochastic assembly line balancing problem in U-lines. The proposed method minimizes total expected cost comprised of total labour cost and total expected incompletion cost. A beam search is an approximate branch and bound method that operates on a search tree. Even though beam search has been used in various problem domains, this is the first application to the assembly line balancing problem. The performance of the proposed method is measured on various test problems. The results of the computational experiments indicate that the average performance of the proposed method is better than the best-known heuristic in the literature for the traditional straight-line problem. Since the proposed method is the first heuristic for the stochastic U-type problem with the total expected cost criterion, we only report its results on the benchmark problems. Future research directions and the related bibliography are also provided in the paper.
引用
收藏
页码:1411 / 1426
页数:16
相关论文
共 20 条
[1]  
Arcus A. L., 1966, INT J PROD RES, V4, P259, DOI [https://doi.org/10.1080/00207546508919982, DOI 10.1080/00207546508919982]
[2]   Synchronous unpaced flow lines with worker differences and overtime cost [J].
Doerr, KH ;
Klastorin, TD ;
Magazine, MJ .
MANAGEMENT SCIENCE, 2000, 46 (03) :421-435
[3]   Balancing of U-type assembly systems using simulated annealing [J].
Erel, E ;
Sabuncuoglu, I ;
Aksu, BA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (13) :3003-3015
[4]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[5]   The stochastic U-Line balancing problem [J].
Guerriero, F ;
Miltenburg, J .
NAVAL RESEARCH LOGISTICS, 2003, 50 (01) :31-57
[6]  
Kottas J., 1973, AIIE T, V5, P164, DOI DOI 10.1080/05695557308974897
[7]  
Kottas J. F., 1976, AIIE Transactions, V8, P234, DOI 10.1080/05695557608975072
[8]   A STOCHASTIC LINE BALANCING PROCEDURE [J].
KOTTAS, JF ;
LAU, HS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (02) :177-193
[9]  
Lowerre B. T., 1976, THESIS
[10]   THE U-LINE LINE BALANCING PROBLEM [J].
MILTENBURG, GJ ;
WIJNGAARD, J .
MANAGEMENT SCIENCE, 1994, 40 (10) :1378-1388